Billable Project Costs As Of 10/31 /2007 <br /> 1 1;15/2007 1 41.56 PM Pale 4 of Ii9 <br /> Project Billed Acti- Total Amount Billed <br /> Billed ~ vi TranDate TranId Resource Employed uantit $Amount OperOvhd AdmOvhd Transaction Remark <br /> 0410 Monroe/Friendly Bike Lane(4325) $83.00 $83.00 <br /> 3636213 Materials estin 83.00 $83.00 <br /> 286C sphaltic concrete quality control (CE) $45.00 .545.00 <br /> 10/03/2007 p7559084 Engineering Assistant I.5 L-H $45.00 BURN-OFF, MOISTURE CONTENT. & SIEVE <br /> ANALYSIS OF AC <br /> 322-6 Asphalt sample pickup 3'38.00 538.00 <br /> 10/03/2007 p7412034 Engineering Technician 2 0.5 L-H $35.00 HMAC S.4:titPLE PICKUP <br /> 10.'03/2007 p7412034 PASSENGER VANS 0.5 H $3.00 Hb9AC SA\4PLE PICKUP <br /> ~ P ,LOp~ <br /> <br /> f <br /> F~ <br /> <br />