Notification of Commencement and <br /> Publlc Works <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> DATE CONTRACT NO. <br /> 12/5/2005 200~Og <br /> PROJECT NAME JOB NO. <br /> Eugene Airport - Menyman Fence 4318 <br /> CONTRACTOR FEDERAL AID PROJECT N0. <br /> Oregon Fence Co. <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> John Casto 682-8473 7/29/05 <br /> FIRST NOTIFICATION <br /> ti/'l/05 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. lnspecbr Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 0 8/11/05 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: S1Z6/2005 <br /> {SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> <br /> y~ Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period: <br /> 8J15J05 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1 AND #2, ALL WORK IS GUARANTEED <br /> BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFE IN WORK THAT <br /> BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WI TH WARRANTY <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE <br /> Inspector Signature <br /> For Privately Engineered Projects Only <br /> Engineer. , <br /> Address: <br /> Owner. <br /> Address: <br /> ~71STRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager Flle <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE A¢ Consfnat Monitor MADD Supervise Inspector <br /> Q:\PROJECTS\PROJ-8\4318\Correspondence\4318 20051205 First Second Third NotificaUon.doc APf7IL 2004 <br /> <br />