Billable Project Costs As Of 07/31/2007 <br /> 08/23/2007 8:16:20 AM Page 12 of 103 <br /> Project Billed Acti- Total Amount Billed <br /> Billed vi TranDate TranId Resource Employed uanti Amount Transaction Remark <br /> 0429 Eastl8th Street (434]) $507.50 $507.50 ~ <br /> 3636213 Materials Testin¢ 507.50 507.50 ~ <br /> 286C Asphaltic concrete quality control (CE) $350.00 $350.00 <br /> 07/30/2007 g7412022 Engineering Technician 2 5 L-H $350.00 HMAC TESTING <br /> 287C PCC quality control (CE) $112.50 $112.50 <br /> 07/25/2007 175590144 Engineering Assistant 2.5 L-H $112.50 MADE 4 PCC SAMPLES <br /> 322-7 Concrete sample pickup $45.00 $45.00 <br /> 07/26/2007 f7S590165 Engineering Assistant 1 L-H $45.00 PICKED UP 4 PCC TEST CYLINDERS <br /> - <br /> <br /> r <br /> <br />