Run Date: 05/01/2006 08:50:12 <br /> City of Eugene <br /> Estimate Distribution <br /> Estimate: revised <br /> Job 93-004338 3ORREL WAY TRAFFIC CALMING <br /> Line No. Description <br /> Quantity Unit Unit Price Amount <br /> SORRBL WAY TRAFFIC CALNING <br /> General <br /> 0010. MOBILIZATION <br /> 0030. TEMP. PROTECTION AND DIRECTION OF TRAFFIC 1.00 LUMP SUM $1,000.00 $1,000.00 <br /> 0040. EROSION CONTROL 1.00 LUMP SUM $2,750.00 $2,750.00 <br /> 0050. gpE~ Bhp 1.00 LUMP SUM $300.00 $300.00 <br /> 0060. LEGENDS 7.00 $1,000.00 $7,000.00 <br /> 0070. TRAFFIC SIGNS COMPLETE 1'00 LUMPSUM $3,000.00 $3,000.00 <br /> Total General 1.00 LUMPSUM $900.00 $900.00 <br /> Total SORREL WAY TRAFFIC CALNING $14,950.00 <br /> $14,950.00 <br /> SORREL WAY TRAFFIC CALMING - Other / Direct <br /> General <br /> 0010. Contingency <br /> 0020. test 1.00 LUMPSUM $1,432.00 $1,432.00 <br /> 0030. Advertising 1.00 LUMPSUM $500.00 $500.00 <br /> Total General 1.00 LUMPSUM $800.00 $800.00 <br /> Total gORREL WAY TRAFFIC CALMING - Other / Direct $2,732.00 <br /> $2,732.00 <br /> SORREL WAY TRAFFIC CALNING - Niscellaneous <br /> General <br /> 0010. Engineering Charge <br /> Total General 1.00 LUMPSUM $15,012.00 $15,012.00 <br /> Total 3ORRBL WAY TRAFFIC CALMING - Hiacellaneous $15,012.00 <br /> $15,012.00 <br /> <br /> Total revised <br /> $32,694.00 <br /> r~ <br /> <br />