Run Date: 11/30/2006 11:25:21 <br /> City of Eugene Page 5 <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractor: INSITUFORM TECH. Original Contract: $859,761.00 <br /> lob 93-004331 Current Amount: $859,761.00 <br /> Contract No: 2007-00005 Contract Award Date: 08/14/2006 <br /> PO 2007100100 Completion Date: 12/01/2006 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals & Complete <br /> Line Description Last Cling Ord Uait Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0570 CONSTRUCT STD. !•/6• PVC SSRVZ $493.00 HACH 1.000 $!93.00 0.000 $0.00 6.000 $2,958.00 600.00 <br /> 0580 CONSTRUCT 6 ZNCH PVC SADDLE CO $635.00 EACH 15.000 $9,525.00 0.000 $0.00 7.000 $9,445.00 47.00 <br /> 0590 CONST. 4"/6" PVC SEWER PIPE $60.00 FT 489.000 $29,340.00 10.000 $600.00 404.800 $29,288.00 83.00 <br /> 0600 DYH TEST AND CONNECTION VERIFI $106.00 EACH 17.000 $1,802.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0610 LOCATE & MAP EXISTING SERVICE $132.00 EACH 6.000 $792.00 0.000 $0.00 5.000 $660.00 83.00 <br /> 111 ternate 2 - Hlk Avenue <br /> 0620 MOBILIZATION $530.00 LUMPSUM 1.000 $530.00 1.000 $530.00 1.000 $530.00 100.00 <br /> 0630 EROSION CONTROL $318.00 LUMPSUM 1.000 $318.00 1.000 $318.00 1.000 $318.00 100.00 <br /> 0640 LANDSCAPING $2,120.00 EACH 1.000 $2,120.00 1.000 $2,120.00 1.000 $2,120.00 100.00 <br /> 0650 AC PATCH, ALL DEPTHS $212.00 TON 2.000 $424.00 1.080 $228.96 1.080 $228.96 59.00 <br /> 0660 CLEANING AND VIDEO INSPECT., P $1,190.00 EACH 1.000 $1,190.00 0.300 $357.00 0.300 $357.00 30.00 <br /> 0670 SPOT REPAIR, 6 INCH PVC $175.00 FT 10.000 $1,750.00 6.000 $1,050.00 6.000 $1,050.00 60.00 <br /> 0680 CONSTRUCT 9" FUSED SADDLE CON $741.00 EACH 4.000 $2,964.00 4.000 $2,964.00 4.000 $2,964.00 100.00 <br /> 0690 CONST. 4•/6• PVC SSWHR PIPH $64.00 FT 20.000 $1,280.00 33.000 $2,112.00 33.000 $2,112.00 165.00 <br /> 0700 LIMITED ACCESS SERVICE CONNECT $2,650.00 EACH 2.000 $5,300.00 2.000 $5,300.00 2.000 $5,300.00 100.00 <br /> 0710 SEWER PIPE 6 INCH HDPS, PIPE B $58.00 FT 341.000 $19,778.00 315.000 $18,270.00 315.000 $18,270.00 92.00 <br /> <br /> 0720 CONCRETE MANHOLE, 24 INCH CONC $1,590.00 EACH 1.000 $1,590.00 1.000 $1,590.00 1.000 $1,590.00 100.00 <br /> $859,761.00 $111,508.87 $769,499.74 <br /> <br />