e ~ <br /> Run Date: 02/01/2007 10:23:37 Page 5 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 005 <br /> Contractor: INSITUPORM THCH. Original Contract: $859,761.00 <br /> Job 93-004331 Current Amount: $861,206.37 <br /> Contract No: 2007-00005 Contract Award Dale: 08/14/2006 <br /> PO 2007100100 Completion Date: 12/01/2006 <br /> Assessable: No <br /> Current Contract Satimated Payment Cumulative Totals & Complete <br /> Line Description Last Cling Ord Unit Price Unit Measure Quaat ity Amount Quantity Amount Quantity Amount <br /> 0570 CONSTRUCT STD. 4•/6• PVC SHRVI $493.00 HACH 1.000 $493.00 0.000 $0.00 6.000 $2,958.00 600.00 <br /> 0580 CONSTRUCT 6 INCH PVC SADDLE CO $635.00 HACH .15.000 $9,525.00 0.000 $0.00 7.000 $4,445.00 47.00 <br /> 0590 CONST. 4"/6• PVC SSWSR PIPS $60.00 PT 489.000 $29,340.00 0.000 $0.00 404.800 $24,288.00 83.00 <br /> 0600 DYH TEST AND CONNECTION VERIFI $106.00 EACH 17.000 $1,802.00 0.000 $0.00 13.000 $1,378.00 76.00 <br /> 0610 LOCATE & MAP HXISTING SBRVICE $132.00 EACH 6.000 $792.00 0.000 $0.00 5.000 $660.00 83.00 <br /> <br /> Alternate 2 - Hlk Aveaue <br /> 0620 MOBILIZATION $530.00 LUMPSUM 1.000 $530.00 0.000 $0.00 1.000 $530.00 100.00 <br /> 0630 HROSION CONTROL $318.00 LUMPSUM 1.000 $318.00 0.000 $0.00 1.000 $318.00 100.00 <br /> 0640 LANDSCAPING $2,120.00 EACH 1.000 $2,120.00 0.000 $0.00 1.000 $2,120.00 100.00 <br /> 0650 AC PATCH, ALL DBPTHS $212.00 TON 2.000 $424.00 0.000 $0.00 1.080 $228.96 54.00 <br /> 0660 CLBANING AND VIDBO INSPHCT., P $1,190.00 HACH 1.000 $1,190.00 0.000 $0.00 1.000 $1,190.00 100.00 <br /> 0670 SPOT RHPAIR, 6 INCH PVC $175.00 FT 10.000 $1,750.00 0.000 $0.00 6.000 $1,050.00 60.00 <br /> 0680 CONSTRUCT 4" FUSHD SADDLE CON $741.00 BACH 4.000 $2,964.00 0.000 $0.00 4.000 $2,969.00 100.00 <br /> 0690 CONS=. 4•/6• PVC BBWHA PZPB $64.00 Pl 20.000 $1,280.00 0.000 $0.00 33.000 $2,112.00 165.00 <br /> 0700 LIMITHD ACCESS SHRVICH CONNHCT $2,650.00 EACH 2.000 $5,300.00 0.000 $0.00 2.000 $5,300.00 100.00 <br /> 0710 SSWHR PIPH 6 INCH HDPE, PZPE B $58.00 FT 341.000 $19,778.00 0.000 $0.00 315.000 $18,270.00 92.00 <br /> 0720 CONCRETH MANHOLH, 24 INCH CONC $1,590.00 HACH 1.000 $1,590.00 0.000 $0.00 1.000 $1,590.00 100.00 <br /> 0730 RHPAIR OF UNMARKED WATHR SBRVI 001 $1,445.37 LUMPSUM 1.000 $1,945.37 1.000 $1,445.37 1.000 $1,445.37 100.00 <br /> $861,206.37 $1,445.37 $775,832.11 <br /> <br />