Run~I73te: tT3%08/2007 08:45:28 Page 2 <br /> ' ~ City of Eugene <br /> Contract Preliminary Progress Payment <br /> ' Payment No 006 Final Pay <br /> Contractor: INSITUFORM TECH. Original Contract: $859,761.00 <br /> Job 93-004331 Current Amount: <br /> $861,206.37 <br /> Contract No: 2007-00005 Contract Award Date: 08/14/2006 <br /> PO 2007100100 Completion Date: 12/01/2006 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals 6 Complete <br /> Liae Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amouat <br /> NA3THNATHR RHH 2006 SA3IN3 DC-11,12,13,15, 23 DF14 <br /> Hase Bid <br /> 0000 Liquidated Damages ($220.00) DAY 0.000 <br /> $0.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION $16,500.00 LUMPSUM 1.000 $16,500.00 0.000 <br /> $0.00 1.000 $16,500.00 100.00 <br /> 0020 THMP. PROTECTION AND DIRECTION $10,590.00 LUMPSUM 1.000 <br /> $10,590.00 0.000 $0.00 1.000 $10,590.00 100.00 <br /> 0030 EROSION CONTROL $3,710.00 LUMPSUM 1.000 $3,710.00 0.250 $927.50 1.000 $3,710.00 100.00 <br /> 0040 LANDSCAPING $10,590.00 LUMPSUM 1.000 $10,590.00 0.000 <br /> $0.00 1.000 $10,590.00 100.00 <br /> 0050 CLEANING & VIDEO INSPECT'., PRE $25,460.00 LUMPSUM 1.000 $25,460.00 0.100 $2,546.00 1.000 $25,460.00 100.00 <br /> 0060 FLAGGERS $48.00 HOUR 80.000 <br /> $3,840.00 0.000 $0.00 61.400 $2,947.20 77.00 <br /> 0070 HMAC Trench Resurfacing $175.00 TON 139.000 $24,325.00 0.000 <br /> $0.00 130.510 $22,839.25 94.00 <br /> 0080 AC COLD PATCH $1.50 SQFT 305.000 <br /> $457.50 0.000 $0.00 370.300 $555.95 121.00 <br /> 0090 CONCRETE 4" $9.50 SQFT 1,885.000 <br /> $17,907.50 0.000 $0.00 1,163.220 $11,050.59 62.00 <br /> 0100 CONCRBTH 5" $10.50 SQFT 350.000 $3,675.00 0.000 <br /> $0.00 863.200 $9,063.60 247.00 <br /> 0110 CONCRBTE 7^ $17.00 SQFT 5,111.000 <br /> $86 887.00 0.000 $0.00 2,731.520 $46,435.84 M 53.00 <br /> 0120 6 INCH CIPP PIPE $32.00 F1' 397.000 $12,704.00 0.000 <br /> $0.00 397.000 $12,704.00 100.00 <br /> 0130 8 INCH CIPP PIPE $34.00 FT 5,831.000 <br /> $198,254.00 0.000 $0.00 5,834.000 $198,356.00 M 100.00 <br /> 0140 10 INCH CIPP PIPE $36.00 FT 456.000 <br /> $16,416.00 0.000 $0.00 456.000 $16,416.00 100.00 <br /> 0150 12 INCH CIPP PIPE $38.00 FT 602.000 $22,876.00 0.000 $0.00 385.000 $14,630.00 64.00 <br /> 0160 6 INCH PVC PIPE $58.00 FT 118.000 <br /> $6,844.00 0.000 $0.00 117.200 $6,797.60 99.00 <br /> 0170 8 INCH PVC PIPE $60.00 FT 166 000 $9 960 00 0 000 $0 00 166 000 $9,960 00 100 00 <br /> O1B0 SPOT REPAIR, 6 INCH PVC $175.00 FT 11.000 $1,925.00 0.000 $0.00 8.900 $1,557.50 81.00 <br /> <br /> 0190 SPOT REPAIR, 8 INCH PVC $185.00 FT 28.000 $5,180.00 0.000 $0.00 34.500 $6,382.50 123.00 <br /> <br /> 0200 SPOT REPAIR, 12 INCH PVC $318.00 FT 12.000 $3,816.00 0.000 $0.00 11.500 $3,657.00 96.00 <br /> <br /> 0210 TREE PROTECTION FENCING $2.00 FOOT 401.000 $802.00 0.000 $0.00 63.300 $126.60 16.00 <br /> <br />