_ <br /> Run Date: 10/04/2006 09:29:56 <br /> City of Eugene Page 2 <br /> Contract Preliminary Progress Payment <br /> Payment No 003 Final Pay <br /> Contractor: 2G CONST. <br /> Job 93-004349 Original Contract: $41,735.92 <br /> Contract No: 2006-00019 Current Amount: $41,735.92 <br /> PO 2006100398 Contract Award Date: 05/05/2006 <br /> Assessable: No Completion Date: 08/01/2006 <br /> Line Description Current Contract Estimated Payment Cumulative Totals <br /> Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity }punt t Complete <br /> Quantity Amount <br /> GRHENHILL TRIG PAIR; SOFIA TO PRAZRIH MTN SCHL PTH <br /> General <br /> 0000 Liquidated Damages ($200.00) DAY 0.000 $0.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION $6,418.38 LUMPSUM 1.000 $6,418.38 0.000 <br /> $0.00 1.000 $6,418.38 M 100.00 <br /> 0020 TEMP. PROTECTION AND DIRECTION $1,437.00 LUMPSUM 1.000 $1,437.00 0.000 <br /> $0.00 1.000 $1,437.00 100.00 <br /> 0030 TEMPORARY SIGNS $129.00 EACR 8.000 $1,032.00 0.000 <br /> $0.00 8.000 $1,032.00 100.00 <br /> 0040 TEMPORARY TYpB ORANGE PLASTIC $4.77 FOOT 300.000 $1,431.00 0.000 <br /> $0.00 267.000 $1,273.59 89.00 <br /> 0050 EROSION CONTROL $1,065.00 LUMPSUM 1.000 $1,065.00 0.000 <br /> $0.00 1.000 $1,065.00 100.00 <br /> 0060 CONSTRUCTION ENTRANCES $1,120.00 EACH 1.000 $1,120.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0070 COMPOST FILTER HERM $3.54 FOOT 300.000 $1,062.00 0.000 <br /> $0.00 240.000 $849.60 80.00 <br /> 0080 CLEARING AND GRUBBING $1,605.00 LVMPSUM 1.000 $1,605.00 0.000 <br /> $0.00 1.000 $1,605.00 100.00 <br /> 0090 RHCONDITIONING EZISTZNG PAT8IPA $1,099.00 LONPSOM 1.000 $1,099.00 0.000 <br /> $0.00 1.320 $1,450.68 132.00 <br /> 0100 (3/4"-0•) AGGREGATE BASE $32.29 CUYD 70.000 $2,260.30 0.000 <br /> $o.o0 61.ogo $1,972.z7 87.00 <br /> 0110 6" CONCRETE SURFACING $4.22 SQFT 3,312.000 $13,976.64 0.000 <br /> $0.00 3,144.000 $13,267.68 M 95.00 <br /> 0120 PERMANENT SEEDING, METHOD 1 OR $0.28 SQFT 4,220.000 $1,181.60 0.000 <br /> $0.00 4,468.000 $1,251.04 106.00 <br /> <br /> 0130 ILLUMINATION - COMPLETB $8,048.00 LUMPSUM 1.000 $8,098.00 0.000 <br /> $0.00 1.000 $8,048.00 M 100.00 <br /> $41,735.92 $0.00 $39,670.24 <br /> <br />