Run'Date: 0911/2007 14:10:39 <br /> • Page 2 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 003 Final Pay <br /> Contractor: EUGENE SAND Original Contract: $805,126.17 <br /> Job 93-004208 Current Amount: $806,853.17 <br /> Contract No: 2007-00020 Contract Award Date: 05/31/2007 <br /> PO 2007100388 Completion Date: <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals 6 Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure _ Quantity Amount Quantity Amount Quantity Amount <br /> OARPATCH W. 11TH TO N 18TH AVS PP <br /> General <br /> 0000 Liquidated Damages ($310.00) DAY <br /> 0.000 $0.00 0.000 $0.00 0.000 <br /> $0.00 D_00 <br /> 0010 MOBILIZATION $13,000.00 LUMPSUM 1.000 <br /> $13,000.00 0.000 $0.00 1.000 <br /> $13,000.00 100.00 <br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO <br /> $6,000.00 LUMPSUM 1.000 $6,000.00 0.000 <br /> $0.00 1.000 $6,000.00 100.00 <br /> 0030 TEMPORARY STRIPING $800.00 LUMPSUM 1.000 <br /> $800.00 0.000 $0.00 1.000 <br /> $800.00 100.00 <br /> 0040 FLAGGERS $39.00 HOUR 2s0.000 $9,750.00 0.000 $0.00 262.000 $10,218.00 lOS.00 <br /> 0050 CITY PROVIDED SPEC INFO SIGNS <br /> $165.00 EACH 4.000 $660.00 0.000 <br /> $0.00 9.000 $660.00 100.00 <br /> 0060 EROSION CONTROL $1,000.00 LUMPSUM 1.000 <br /> $1,000.00 0.000 $0.00 1.000 $1,000.00 100.00 <br /> 0070 SURFACING STABILIZATION $s7.00 CUYD 218.000 <br /> $12,426.00 0.000 $0.00 172.s40 $9,834.78 79.00 <br /> 0080 ADJUSTING BOXES $250.00 EACH 5.000 <br /> $1,zso.oo o.ooo $o.oo s.ooo $1,zso.oo 100.00 <br /> 0090 MINOR ADJUSTMENT OP MANHOLES <br /> $1,100.00 EACH 14.000 $16,400.00 0.000 <br /> $0.00 13.000 $14,300.00 93.00 <br /> 0100 MH REM/REPL FRAME/COVER-WW <br /> $240.00 EACH 7.000 $1,680.00 0.000 <br /> $0.00 6.000 $1,440.00 86.00 <br /> 0110 MH REM/REPL FRAME/COVER-ST <br /> $240.00 EACH 7.000 $1,680.00 0.000 <br /> $0.00 7.000 $1,680.00 100.00 <br /> 0120 COLD PLAtiH PVMT RB]QOVAL, 2" DE 50.27 SQPT 3,078.000 $831.06 0.000 $0.00 26,298.500 $7,100.60 854.00 <br /> 0130 COLD PLANE PVMT REMOVAL, 3" DE <br /> $0.25 SQFT 87,788.000 $21,947.00 0.000 <br /> $0.00 63,985.660 $15,996.91 73.00 <br /> 0140 LEVEL 2, 1/2" DENSE HMAC <br /> $54.00 TON 1,707.000 $92,178.00 0.000 <br /> $0.00 1,537.110 $83,003.94 M 90.00 <br /> 0150 LEVEL 2, 3/4" DENSE HMAC <br /> $80.00 TON 194.000 $11,520.00 0.000 <br /> $0.00 198.320 $11, 866.60 103.00 <br /> 0160 CONCRETE CURBS $26.00 FOOT 22.000 <br /> $s7z.oo o.ooo $o.o0 2z.ooo $s7z.oo loo.oo <br /> 0170 CONCRETE ISLANDS $22.00 SQFT 96.000 <br /> $2,112.00 0.000 $0.00 96.000 $2,112.00 100.00 <br /> 0180 CONCRETE WALKS $19.00 SQFT 210.000 <br /> $3,990.00 0.000 $0.00 229.160 $4,364.04 109.00 <br /> 0190 TRUNCATED DOME TEXTURING <br /> $30.00 SQFT 60.000 $1,800.00 0.000 <br /> $0.00 60.000 $1,800.00 100.00 <br /> <br /> 02D0 PVMT LEGEND, TYPE A2 or B: AR <br /> $100.00 EACH 8.000 $600.00 0.000 <br /> $0.00 6.000 $600.00 75.00 <br /> <br /> 0210 PVMT LINE, TYPE A2 or B <br /> $6.00 SQFT 300.000 $1,600.00 0.000 <br /> $0.00 234.000 $1,170.00 78.00 <br /> <br />