Run. Date: 07/12/2007 09:28:35
<br /> . ' City of Eugene Page 2
<br /> , Contract Preliminary Progress Payment
<br /> Payment No 001
<br /> Contractor: EUGENE SAND
<br /> Job 93-004208 Original Contract: $805,126,17
<br /> Contract No: 2007-00020 Current Amount: $805,126.17
<br /> PO 2007100388 Contract Award Date: 05/31/2007
<br /> Assessable: No Canpletion Date:
<br /> Line Description Last Chng Ord Current Contract Estimated Payment Cumulative Totals
<br /> Unit Price Unit Measure Quantity Amount Quantity ~ Complete
<br /> Amount Quantity Amount
<br /> OARPATCB M. 21T$ 1'O 1P 18TH AVS PP
<br /> General
<br /> 0000 Liquidated Damages ($310.00) DAY
<br /> o.oo0 50.00 0.000 $o.oo o.ooo
<br /> 0010 MOBILIZATION $0.00 0.00
<br /> $13,000.00 LUMPSUM 1.000 $13,000.00 1.000
<br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO $13,000.00 1.000 $13,000.00 100.00
<br /> $6,000.00 LUMPSUM 1.000 $6,000.00 0.500
<br /> 0030 TEMPORARY STRIPING $3,000.00 0.500 $3,000.00 50.00
<br /> $800.00 LUMPSUM 1.000 $800.00 0.500
<br /> 0040 FLAGGERS $400.00 0.500 $400.00 50.00
<br /> $39.00 HOUR 250.000 $9,750.00 214.000
<br /> 0050 CITY PROVIDED SPEC INFO SIGNS $8,346.00 214.000 $8,346.00 86.00
<br /> $165.00 EACH 4.000 $660.00 2.000
<br /> 0060 EROSION CONTROL $330.00 2.000 $330.00 50.00
<br /> $1,000.00 LUMPSOM 1.000 $1,000.00 0.500
<br /> 0070 SURFACING STABILIZATION $500.00 0.500 $500.00 50.00
<br /> $57.00 CUYD 218.000 $12,426.00 172.540
<br /> 0080 ADJUSTING BOXES $9,834.78 172.540 $9,834.78 79.00
<br /> $250.00 EACH 5.000 $1 250.00 5.000
<br /> 0090 MINOR ADJUSTMENT OF MANHQLES $1,250.00 5.000 $1,250.00 100.00
<br /> $1,100.00 EACH 14.000 $15,400.00 13.000
<br /> 0100 MH REM/REPL FRAME/COVER-WW $14,300.00 13.000 $14,300.00 93.00
<br /> $240.00 EACH 7.000 $1,680.00 6.000
<br /> 0110 MH REM/REPL FRAME/COVER-ST $1,440.00 6.000 $1,440.00 86.00
<br /> $240.00 EACH 7.000 $1,680.00 7.000
<br /> 0120 $1,680.00 7.000 $1,680.00 100.00
<br /> COLD PLANE PVMT REMOVAL, 2• DE $0.27 SQFT
<br /> 3,078.000 $831.06 26,296.500 $7,100.60 26,298.500
<br /> 0130 COLD PLANE PVMT REMOVAL, 3" DE $7,100.60 854.00
<br /> $0.25 SQFT 87,788.000 $21,947.00 63,985.650
<br /> 0140 LEVEL 2, 1 2" DENSE HMAC $15,996.41 63,985.650 $15,996.41 73.00
<br /> $54.00 TON 1,707.000 $92,178.00 1,537.110
<br /> 0150 LEVEL 2, 3/4" DENSE HMAC $83,003.94 1,537,110 $83,003.94 M 90.00
<br /> $80.00 TON 144.000 $11,520,00 148.320
<br /> 0160 CONCRETE CURBS $11,865.60 148.320 $11,865.60 103.00
<br /> $26.00 FOOT 22.000 $572,00 22.000
<br /> 0170 CONCRETE ISLANDS $572.00 22.000 $572.00 100.00
<br /> $22.00 SQFT 96.000 $2,112,00 96.000
<br /> 0180 CONCRETE WALKS $2,112.00 96.000 $2,112.00 100.00
<br /> $19,00 SQFT 210.000 $3,990.00 227.410
<br /> 0190 TRUNCATED DOME TEXTURING $4,130.79 217.910 $4,130.79 104.00
<br /> $30.00 SQFT 60.000 $1,800.00 60.000
<br /> 0200 $1,800.00 60.000 $1,800.00 100.00
<br /> PVMT LEGEND, TYPE A2 or B: AR 100.00 EACH
<br /> 8.000 $800.00 0.000 $0.00 0.000
<br />
<br /> 0210 PVMT LINE, TYpE A2 or B $0.00 0.00
<br /> $5.00 SQFT 300.000 $1,500.00 0.000
<br /> $0,00 0.000 $0.00 0.00
<br />
<br />
|