New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4343 CO1
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4343 CO1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 4:37:47 PM
Creation date
6/17/2008 3:36:45 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004343
GL_Project_Number
965514
Identification_Number
2006100479
COE_Contract_Number
2006-00030
Retention_Destruction_Date
6/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r~ S CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job# 4343(4353!4355 <br /> Contract# 2008-30 <br /> CONTRACTOR: Wlldlah Conatnrction Change Order # 1 <br /> (ADDRESS) P.O.Boz7428 Date: 8/30/2006 <br /> Eudane, OR 97401-0428 GAMS Date: <br /> Revlevred by: Date: <br /> PROJECT: 2008 PPP on Gerfleld, Anhur, Seneca and 1Nashinoton Inspector. D.Rau II <br /> S.Rice <br /> Proj. Mgr. M.Rodnpuea <br /> Principal Enp. P.Klooe ~ ( <br /> You are directed to make the following changes in this contract: <br /> Contract <br /> kam <br /> No. <br /> t81 haft a ad uatment for ]u <br /> 182 As haft rip a uetment for Au uet <br /> 171 Ae hell rip ad wtmern for Sul <br /> 172 Ae halt rip ad uetment for Au uet <br /> 381 Ae halt rla a uahnentfor3u <br /> 391 haft rice a uetment for 3u1 <br /> 811 Ae halt rice a uatment for 7u <br /> 821 eft rlos ad uetment for Sul <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Tims Quantity Unit Amended Net <br /> No. ttem Chan a Units Cost Amount Chan a Change <br /> Orl anal 0.00 0.00 0.00 ;0.00 <br /> 161 Level 2, 1/2" HMAC Price Adjustment -Garfield Revised 0.00 .00 0.00 <br /> Amended 620.81 tons 4.62 2992.30 2 992.30 <br /> Ori Inat 0.00 0.00 0.00 ;0.00 <br /> 162 Level 2, 1/2" HMAC Price Adjustment -Garfield Revised 0.00 0.00 0.00 <br /> Amended 1 123.48 tons ;7.14 8 021,65 38 021.65 <br /> Ori Ina! 0.00 0.00 0.00 ;0.00 <br /> 171 Level 2, 3/4" HMAC Price Adjustment -Garfield Revised 0.00 0.00 0.00 <br /> Amended 243.82 tons .82 1175.21 1175.21 <br /> On anal 0.00 0.00 .00 ;0.00 <br /> <br /> ~r 172. Level 2, 3/4" HMAC Pnce Adjustment -Garfield Revised 0.00 0.00 O.DO <br /> Amended 134.03 tons 7.14 5956.97 ;956.97 <br /> Orl Ina! 0.00 0.00 0.00 ;0.00 <br /> 381 Leve12, 1/2" HMAC Price Adjustment -Seneca Revised 0.00 0.00 0.00 <br /> Amended 636.94 tons .82 3 070.05 ;3 070.05 <br /> Orl Ina! 0.00 0.00 0.00 ;0.00 <br /> 391 Level Z, 3(4" HMAC Price Adjustment -Seneca Revised 0.00 .00 0.00 <br /> Amended 220.23 tons .82 ;1061.51 1061.51 <br /> ON Ina! 0.00 0.00 0.00 ;0.00 <br /> 611 Level 3, 1/2" HMAC PHce Adjusbnent -Washington Revised 0.00 .00 0.00 <br /> Amended 437.69 tons .82 2 109.67 ;2 109.67 <br /> Ori Ina! 0.00 0.00 O.OD $0.00 <br /> 621 Level 3, 3/4" HMAC Pnce Adjustment -Washington Revised 0.00 0.00 0.00 <br /> Amended 356.58 tons K.82 1 718.72 ;1 718.72 <br /> The original contract work days are o.0 da <br /> The contract time change this C.O o.o de <br /> The contrect time change by previous C.O.'s o.o da <br /> The new contract work da s are o.o da <br /> The original contract sum was ;515,188.10 <br /> Net change by previous change order <br /> Net change due to amendment by previous change order <br /> The contract sum prior to this change order was 5515,188.10 <br /> This change order will change contract sum by this amount . Ezt,tos.ofi <br /> The new contract net change sum ;0.00 <br /> The new contract amendment sum: 52t,1o6.a6 <br /> ................................_......_...._._...._.............._......._........._..m_..__.....__......._................_............... <br /> The new contrect sum including this change order will be 5538,29a.1a <br /> ........_......._._...._.._....._..........._--.m._...._. <br /> Percents a of orf final contract a.1o% <br /> N HAN D AMEN M N //11 4.1 <br /> Approval by: G~ <br /> Ci nglneer rime Co trec r Third Party <br /> r~GloG 6 0 <br /> Date Dat Date <br /> CONTRACTOR ~ OFFICE FILE ~ PURCHASING/CRO <br /> 0\FORMSIPROJECTCONSTIREVISEDCHANGEORDER.XI.S 09-0~-Qt) A05~23 iN <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.