•I, <br /> Run Date: 08/08/2006 16:27:31 <br /> City of Eugene Page 4 <br /> Contract Preliminary progress Payment <br /> Payment No 001 <br /> Contractor: WILDZSH CONST. <br /> Job 93-004353 Original Contract: $515,188.10 <br /> Contract No: 2006-00030 Current Amount: $515,188.10 <br /> PO 2007100052 Contract Award Date: 06/26/2006 <br /> Assessable: No Completion Date: 09/01/2006 <br /> Line Description Last Chnq Ord Current Contract Estimated Payment Cumulative Totals <br /> Unit Price Unit Measure quantity Amount b Complete <br /> Quantity Amount quantity Amount <br /> 0340 MINOR ADJUSTMENT OF MANHOLES <br /> $600.00 EACH 3.000 $1,800.00 0.000 <br /> 0350 MH REM/REPL FRAME/COVER-ST $0.00 0.000 $0.00 0.00 <br /> $250.00 EACH 3.000 $750.00 0.000 <br /> 0360 COLD PLANE pVMT REMOVAL, 2" DE 50.00 0.000 $0.00 0.00 <br /> $0.25 SQFT 41,676.000 $10,419.00 43,856.500 <br /> 0370 COLD PLANE PVMT REMOVAL, 4" DE $10,964.13 43,856.500 $10,964.13 105.00 <br /> $0.30 SQFT 7,038.000 $2,111.40 7,268.000 <br /> 0380 LEVEL 2, 1/2" DENSE HMAC $2,180.40 7,268.000 $2,180.40 103.00 <br /> $65.00 TON 614.000 $39,910.00 0.000 <br /> 0390 LEVEL 2, 3/4" DENSE HMAC $0.00 0.000 $0.00 0.00 <br /> $82.00 TON 140.000 $11,480.00 0.000 <br /> 0400 PVMT LEGEND, TYpE Al OR A2: AR $0.00 0.000 $0.00 0.00 <br /> $90.00 EACH 7.000 $630.00 0.000 <br /> 0410 PVMT LEGEND, TYPE Al OR A2: HZ $0.00 0.000 $0.00 0.00 <br /> $150.00 EACH 2.000 $300.00 0.000 <br /> 0420 PVMT LINE, TYPE Al OR A2 $0.00 0.000 $0.00 0.00 <br /> $4.50 SQFT 440.000 $1,980.00 0.000 <br /> 0430 MONO-DIRECTIONAL CRYSTAL TYPE $0.00 0.000 $0.00 0.00 <br /> $5.00 EACH 15.000 $75.00 0.000 <br /> 0440 BI-DIRECTIONAL YEI.I,OW TYPE I M $0.00 0.000 $0.00 0.00 <br /> $5.00 EACH 75.000 $375.00 0.000 <br /> 0450 $0.00 0.000 $0.00 0.00 <br /> THERMOPLASTIC, NON-PROFILE, 90 $7,000.00 LUMPSUM <br /> 1.000 $7,000.00 0.000 $0.00 0.000 <br /> 0460 LOOP DETECTORS INSTALLATION $0.00 0.00 <br /> $5,769.00 LUMPSUM 1.000 $5,769.00 0.000 <br /> $0.00 0.060 $0.00 0.00 <br /> PPP iPABHZNGTON 3T; N 6TH AVg - N 8TH avs $141,266.40 $36,877.03 C~ <br /> i~c~~j $36,877.03 <br /> General v` <br /> 0000 Liquidated Damages <br /> ($310.00) DAY <br /> 0.000 $0.00 0.000 $0.00 <br /> 0470 MOBILIZATION 0.00 <br /> $14,000.00 LUMPSUM 1.000 $14,000.00 0.870 <br /> 0480 TEMP. WORK ZONE TRAFFIC CONTRO $12,180.00 O.B70 $12,180.00 87.00 <br /> $9,000.00 LUMPSUM 1.000 $9,000.00 0.330 <br /> <br /> 0490 TEMPORARY STRZPING $2,970.00 0.330 $2,970.0p 33.00 <br /> $2,500.00 LUMPSUM 1.000 $2,500.00 0.330 <br /> $825.00 0.330 $825.00 33.00 <br /> <br />