Billable Project Costs As Of 07/31 /2006 <br /> 08/30/2006 3:45:13 PM Page 2 of 106 <br /> Project Billed Acti- Total Amount Billed <br /> Billed BY vi TranDate TranId Resource Employed uanti $Amount OperOvhd AdmOvhd Transaction Remark <br /> <br /> 0407 Pavement Preserv Pgm: Arthur St/Garfield (4343) $471.04 $569.92 $1,040.96 <br /> 3636213 Materials Testine $471.04 5569.92 $1,040.96 <br /> 285C Base aggregates quality control (CE) 5101.92 $117.34 3'219.26 <br /> 07/19/1006 e13560104 Engineering Technician 2 1.5 L-H $34.68 $50.29 <br /> 07/192006 e13560104 PASSENGER VANS 1.5 H $9.00 <br /> 07/202006 e13560105 Engineering Technician 2 2 L-H $46.24 $67.05 <br /> 07/202006 e13560105 PASSENGER VANS 2 H $12.00 <br /> 286C Asphaltic concrete quality control (CE) $328.44 $402.29 $730.73 ' <br /> 07/192006 e1356084 Engineering Technician 2 1.5 L-H $34 68 $50.29 BASE AC DF' S <br /> 07/192006 e1356084 PASSENGER VANS 1.5 H $9.00 BASE AC DF'S <br /> 07/202006 e13560125 Engineering Technician 2 1.5 L-H $52.02 $75.43 <br /> 07/202006 e13560125 PASSENGER VANS 1.5 H $9.00 <br /> 07/292006 g1356047 Engineering Technician 2 5.5 L-H $190.74 $276.57 AC DF~S <br /> 07/292006 g1356047 PASSENGER VANS 5.5 ~ H $33.00 AC DF' S i <br /> 322-6 Asphalt sample pickup 540.68 550.29 590.97 <br /> 07292006 81356027 Engineering Technician 2 1 L-H $34.68 $50.29 AC SAMPLE P/U <br /> 07/292006 81356027 PASSENGER VANS 1 H $6.00 AC SAMPLE P/U <br /> • <br /> <br />