Run Date: 04 ?006 15:14:47 City Eugene T ' <br /> Estimat ,~stribution <br /> Estimate: PPP SENECA; WITH - W11TH <br /> Job 93-004353 PPP SSNSCA RD; W 7TH AV8 - ~i 11TH AVS <br /> Line No. Description Quantity Unit Unit Price Amount <br /> PPP 38NSCA RD; OP 7TH AVB - W 11TH AVB <br /> General <br /> 0010. MOBILIZATION 1.00 LUMP SUM $12,000.00 $12,000.00 <br /> 0020. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMP SUM $8,000.00 $8,000.00 <br /> 0030. TEMPORARY STRIPING 1.00 LUMP SUM $1,500.00 $1,500.00 <br /> 0040. FLAGGERS 350.00 HOUR $36.00 $12,600.00 <br /> 0050. POLICE FLAGGERS 75.00 HOUR $65.00 $4,875.00 <br /> 0060. CITY PROVIDED SPEC INFO SIGNS 4.00 EACH $250.00 $1,000.00 <br /> 0070. EROSION CONTROL 1.00 LUMP SUM $1,500.00 $1,500.00 <br /> 0080. SURFACING STABILIZATION 111.00 CUYD $60.00 $6,660.00 <br /> 0090. ADJUSTING BOXES 3.00 EACH $300.00 $900.00 <br /> 0100. MINOR ADJUSTMENT OF MANHOLES 5.00 EACH $800.00 $4,000.00 <br /> 0110. MH REM/REPL FRAME/COVER-WW 3.00 EACH $250.00 $750.00 <br /> 0120. COLD PLANE PVMT REMOVAL, 2" DEEP 41,676.00 SQFT $0.30 $12,502.80 <br /> 0130. COLD PLANE PVMT REMOVAL, 4" DEEP 7,038.00 SQFT $0.40 $2,815.20 <br /> 0140. LEVEL 2, 1/2" DENSE HMAC 614.00 TON $45.00 $27,630.00 <br /> 0150. LEVEL 2, 3/4" DENSE HMAC 140.00 TON $55.00 $7,700.00 <br /> 0160. PVMT LEGEND, TYPE Al OR A2: ARROWS 7.00 EACH $80.00 $560.00 <br /> 0170. PVMT LEGEND, TYPE Al OR A2: BICYCLE LANE SYMB 2.00 EACH $90.00 $180.00 <br /> 0180. PVMT LINE, TYPE Al OR A2 440.00 SQFT $4.00 $1,760.00 <br /> 0190. MONO-DIRECTIONAL CRYSTAL TYPE I MARKERS 15.00 EACH $3.00 $45.00 <br /> 0200. BI-DIRECTIONAL YELLOW TYPE I MARKERS 75.00 EACH $3.25 $243.75 <br /> 0210. THERMOPLASTIC, NON-PROFILE, 90 MIL, EXTRUDED 1.00 LUMP SUM $8,000.00 $8,000.00 <br /> 0220. LOOP DETECTORS INSTALLATION 1.00 LUMP SUM $10,000.00 $10,000.00 <br /> Total General $125,221.75 <br /> Total PPP S6NBCA RD; W 7TH AVB - W 11TH AVB <br /> $125,221.75 <br /> PPP SBNECA RD; W 7TH AV8 - W 11TH AV8 - Other / Direct <br /> General <br /> 0009. Contingency 10~ of Contract $12,522.18 <br /> 0010. PAVEMENT TESTING 2~ of Contract $2,504.44 <br /> 0030. Advertising 1.00 LUMPSUM $500.00 $500.00 <br /> 0040. Printing 1.00 LUMPSUM $1,200.00 $1,200.00 <br /> Total General $16,726.61 <br /> Total ppp 3EN8CA RD; W 7TH AVS - W 11TH AVB - Other / Direct $16,726.61 <br /> PPP Sffi~ECA RD; W 7TH AVS - W 11TH AVE - Miscellaneous <br /> General <br /> 0010. Engineering Charge 23~ of Direct $32,648.12 <br /> 0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $788.00 $788.00 <br /> Total General $33,436.12 <br /> Total ppp SHNBCA RD; W 7TH AV$ - W 11TH AVB - Miscellaneous $33,436.12 <br /> <br /> Total PPP SENECA; W7TH - W11TH <br /> $175,384.48 <br /> <br />