I <br /> Rua Date: 09/07/2006 10:03:50 page 4 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractors EUGENE SAND Original Contract: $393,527.16 <br /> Job 93-004352 <br /> Current Amount: $407,231.98 <br /> Contract No: 2006-00023 Contract Avard Date: 06/09/2006 <br /> PO 2006100455 Completion Date: 07/28/2006 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals t Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0300 MOBILIZATION $17,500.00 LUMPSUM 1.000 <br /> $17,soo.oo o.ooo So.oo l.ooo $17,soo.oa loo.oo <br /> 0310 TEMP. WORK ZONE TRAFFIC CONTRO $6,000.00 LUMPSUM 1.000 <br /> $6,000.00 0.100 $600.00 1.000 $6,000.00 100.00 <br /> 0320 TEMPORARY STRIPING $700.00 LUMPSUM 1.000 <br /> $700.00 0.000 $0.00 1.000 $700.00 100.00 <br /> 0330 FLAGGERS $39.00 HOUR 250.000 <br /> $9,750.00 0.000 $0.00 232.500 $9,067.50 93.00 <br /> 0340 POLICE FLAGGERS $65.00 HOUR 50.000 <br /> $3,250.00 0.000 $0.00 35.500 $2,307.50 71.00 <br /> 0350 CITY PROVIDED SPEC INFO SIGNS $175.00 EACH 4.000 <br /> $700.00 0.000 $o.o0 4.000 $700.00 loo.oo <br /> 0360 EROSION CONTROL $1,300.00 LUMPSUM 1.000 <br /> $1,300.00 0.100 $130.00 1.000 $1,300.00 100.00 <br /> 0370 10 INCH C900 PIPE $125.00 FOOT 50.000 <br /> $6,250.00 0.000 $0.00 60.000 $7,500.00 120.00 <br /> 0380 15 INCH PVC PIPS $140.00 FOOT 8.000 <br /> $1,120.00 0.000 $0.00 9.000 $1,260.00 113.00 <br /> 0390 PIPE TEES, 10 INCH $350.00 EACH 2.000 <br /> 5700.00 0.000 $o.oo z.ooo $700.00 loo.oo <br /> 0400 CATCB BASINS, M/BI1CH PROOF GRA $1,400.00 HACK 1.000 <br /> $1,400.00 0.000 $0.00 2.000 52,800.00 200.00 <br /> 0410 ADJUSTING BOXES $200.00 EACH 1.000 <br /> $200.00 0.000 $0.00 1.000 $200.00 100.00 <br /> 0420 MINOR ADJUSTMENT OF MANHOLES $900.00 EACH 9.000 <br /> $8,100.00 0.000 $0.00 5.000 $4,500.00 56.00 <br /> 0430 MH RSM/REPL PRAMS/COVER-ST $290.00 EACH 3.000 <br /> $720.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0440 MH REM/REPL FRAMH/COVER-WW $240.00 EACH 6.000 <br /> $1,440.00 0.000 $0.00 4.000 $960.00 67.00 <br /> <br /> 0450 COLD PLANE PVMT REMOVAL, 2" DH $0.43 SQFT 888.000 $381.84 0.000 <br /> $0.00 888.000 $381.84 100.00 <br /> <br /> 0460 COLD PLANE PVMT REMOVAL, 3" DH $0.27 SQFT 72,666.000 $19,619.82 0.000 <br /> $0.00 73,168.500 $19,755.50 101.00 <br /> <br /> 0470 PAVEMENT REMOVAL $2.00 SQFT 825.000 <br /> $1,650.00 0.000 $0.00 775.000 $1,550.00 94.00 <br /> <br /> 0480 LEVEL 2, 1/2" DENSE HMAC $51.00 TON 1,340.000 $68,340.00 0.000 $0.00 1,290.300 $65,805.30 M 96.00 <br /> <br /> 0490 LEVEL 2, 3/9" DENSE HMAC $75.00 TON 29.000 <br /> $z,loo.oo o.ooo $o.oo o.ooo So.oo o.oo <br /> <br />