CITY OF EUGENE <br /> PARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job # 4369 & 4351 <br /> Contract # 2006-24 <br /> CONTRACTOR: WILDISH CONSTRU ION INC Change Order # 5 <br /> (ADDRESS) PO BOX 7428 Date: _ 10/05/06 <br /> EUGENE, OR 97401-0428 CAMS Date: <br /> Reviewed by: Date: <br /> PROJECT: PAVEMENT PRESERVATION PROGRAM 1) HILYARD ST FROM Inspector: M. Koivula <br /> E 13TH AVE TOE 24TH AVE 2) PATTERSON ST. FROM E BROADWAY S. Rice <br /> TOE 13TH AVE (JOB #4351) Proj. Mgr. S. Gallup <br /> Principal Eng. P. Klooe <br /> You are directed to make the following changes in this contract: <br /> Contract <br /> Item <br /> No. <br /> 104 Excavation around existin tree roots vicinit of 23+00 ri ht includin re-excavate and root sawin after deliberation and investi anon b licensed arborist <br /> Ci Urban Forest Technician and Ci Pro ect Mana er. Standb time included. North of 21st Street, east side of Hil rd. <br /> 351 Remove new 8" solid thereto lastic stri in b rindin surface of new ac avin . Re lace with 4" white ski stri a with mono-directional markers <br /> "Connector Cou ler" road from Patterson Street to Hil rd at 23rd Avenue. <br /> 531 Perform a 7' wide 4" de th mill on Patterson Street in the west arkin area from Broadwa south to the brid a deck at 0.53/SF Patterson . <br /> 562 Place Leve13, 3/4" Dense HMAC in the 7' wide 4" mill from Broadwa south to the brid a deck at $72lTON Patterson . <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Time Quantity Unit Amended Net <br /> No. Item Change (Units) Cost Amount Change Change <br /> Ori final 0.00 0.00 0.00 $0.00 <br /> 104 Tree Excavation, Including Standby 0 Revised 0.00 0.00 0.00 <br /> N of 21st East Side of Hi and Amended 1.00 LS $575.00 $575.00 $575.00 <br /> Ori final 0.00 0.00 0.00 $0.00 <br /> 351 Remove 8" Solid Stripe, Replace with 4" Skip 0 Revised 0.00 0.00 0.00 <br /> Stri a 23rd -Hil and Coupler Amended 1.00 LS $2 325.00 $2 325.00 $2 325.00 <br /> 531 4" Mill -Patterson Ori final 0.00 0.00 0.00 $0.00 <br /> 0 Revised 0.00 0.00 0.00 <br /> Amended 4 739.00 SF $0.53 $2 511.67 $2,511.67 <br /> 562 Level 3, 3/4" Dense HMAC -Patterson Ori final 0.00 0.00 0.00 $0.00 <br /> 0 Revised 0.00 0.00 0.00 <br /> Amended 147.60 TON $72.00 $10 627.20 $10 627.20 <br /> Ori final 0.00 0.00 0.00 $0.00 <br /> 0 Revised 0.00 0.00 0.00 <br /> Amended 1.00 $0.00 $0.00 <br /> Ori inaf 0.00 0.00 0.00 $0.00 <br /> 0 Revised 0.00 0.00 0.00 <br /> Amended 1.00 $0.00 $0.00 <br /> The original contract work days are o.o da s <br /> The contract time change this C.O o.o da s <br /> T`-~ contract time change by previous C.O.'s o.o da s 10 -1 3 - 0 6 P 12 ~ 0 0 1 N <br /> new contract work da s are o.o da s <br /> The original contract sum was ~ $1,606,620.50 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. <br /> Net change by previous change order ($1s 250.10) <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> et change due to amendment by previous change order $8o,33s.71 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> he contract sum prior to this change order was $1,ss7,7o7.11 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> This change order will change contract sum by this amount $16,038.87 <br /> The new contract net change sum ($19.250.10) <br /> The new contract amendment sum $96,375.58 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. <br /> The new contract surrtincluding this change order will be $1.683.745.98 <br /> Percents a of on final contract <br /> 4.80% <br /> NET CH NGE DUE TO AMENDMENTS 6.00% <br /> <br /> Appr val y: <br /> ngineer Prime Con c or Third Party <br /> Date Date Date <br /> CONTRACTOR Q OFFICE FILE ~ PURCHASING/CRO <br /> Q\FORMS\PROJECIICONST\REVISED CHANGE ORDER.XLS <br /> <br />