<br /> Run Date: 08/23/2006 09:10:41
<br /> City of Eugene Page 2
<br /> Contract Preliminary Progress Payment
<br /> Payment No 003
<br /> Contractor: WILDISH CONST.
<br /> Job q: 93-004369 Original Contract: $1,606,620.50
<br /> Contract No: 2006-00024 Current Amount: $1,606,620.50
<br /> PO 2006100453 Contract Award Date: 06/09/2006
<br /> Assessable: No Completion Date: 09/01/2006
<br /> Line Description Current Contract Estimated Payment Cumulative Totals
<br /> Last Cluig Ord Unit Price Unit Measure Quantity Amount 8 Complete
<br /> Quantity Amount Quantity Amount
<br /> PPP HILYARD ST; 13TH - 24TH
<br /> Cianeral
<br /> 0000 Liquidate Damages (PH 163) ($1,500.00) DAY 0.000
<br /> 0000 Li $0.00 0.000 $0.00 0.00
<br /> quidated Damages (PH 264) ($250.00) HOUR 0.000
<br /> $0.00 0.000 $0.00 0.00
<br /> 0010 MOBILIZATION $160,000.00 LUMPSUM
<br /> 1.000 $160,000.00 0.000 $0.00 1.000 $160,000.00 100.00
<br /> 0020 GSNBRAL EXCAVATION MOBILIZATIO $15,000.00 LUMPSUM
<br /> 1.000 $15,000.00 0.000 $0.00 0.000 $0.00
<br /> 0.00
<br /> 30 THMP. WORK ZONH TRAFFIC CONTRO $20,000.00 LUMPSUM
<br /> l.ooo $20,000.00 0.000 So.oo o.aoo $16,000.00 ao.oo
<br /> 0040 TREE PROTECTION $6,000.00 LUMPSUM
<br /> 1.000 $6,000.00 0.000 $4,800.00
<br /> $0.00 O.B00 80.00
<br /> 0050 TEMPORARY SIGNS $16.00 SQFT 1,700.000
<br /> $27,200.00 0.000 $0.00 1,105.600 $17,689.60 65.00
<br /> 0060 TEMPORARY STRIPING $6,000.00 LUMPSUM
<br /> 1.000 $6,000.00 0.000 $0.00 0.500 $3,000.00
<br /> 50.00
<br /> 70 EROSION CONTROL $3,000.00 LUMPSUM
<br /> 1.000 $3,000.00 0.000 $0.00 0.800 $2,400.00
<br /> 80.00
<br /> 080 INLET PROTECTION $50.00 EACH
<br /> 38.000 $1,900.00 0.000 $0.00 22~. 000 $1,100.00
<br /> 0090 SAWCUTTING $3.00 FOOT 58.00
<br /> 9,338.000 $28,014.00 0.000 $0.00 7,614.000 $22,842.00
<br /> 82.00
<br /> 0100 REM EXISTING PAVEMBNT AND FEAT $95,000.00 LUMPSUM
<br /> 1.000 $95,000.00 0000 $0.00 0.500 $47,500.00 50.00
<br /> 0110 GENERAL EXCAVATION $13.00 CUYD
<br /> 9,500.000 $123,500.00 0.000 $0.00 5,968.800 $71,094.40 58.00
<br /> 0120 SUBGRADS STABILIZATION $25.00 CUYD
<br /> 0130 ~ 2,000.000 $50,000.00 0.000 $0.00 0.000 $0.00
<br /> 0.00
<br /> SUBGRADB GEOTEXTILE $1.00 SQYD 19,292.000
<br /> $19,292.00 0.000 $0.00 7,811.000 $7,811.00 40.00
<br /> 0140 CONCRETE CURB AND GUTTER $25.00 FOOT
<br /> 547.000 $13,675.00 0.000 $0.00 595.000 $14,875.00 109.00
<br /> 0150 REPAIR EXISTING CURBS $75.00 LINFT
<br /> 30.000 $2,250.00 0.000 $0.00 0.000 $0.00 0.00
<br />
<br /> 0160 1 1 2" - 0" AGGREGATE BASE $11.25 TON
<br /> 16,424.000 $184,770.00 0.000 $0.00 9,476.000 $106,605.00 M 58.00
<br />
<br />
|