New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4351 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4351 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:25:08 PM
Creation date
6/17/2008 1:39:09 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004351
GL_Project_Number
965454
Identification_Number
Begin Warranty
COE_Contract_Number
2006-00024
Retention_Destruction_Date
11/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br /> Public Works <br /> <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> DATE CONTRACT NO. <br /> 9/1 /2006 2006-24 <br /> PROJECT NAME JOB NO. <br /> 2006 PPP Patterson St. 4351 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Wildish <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Lisa Je es 541 682-6231 6/09/2006 <br /> FIRST NOTIFICATION <br /> 8/12/2006 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 9/01/2006 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 9/22/2006 <br /> 'SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 12/01/2006 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1 AND #2, ALL WORK IS GUARANTEED <br /> BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br /> BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHI E ONE- AR WA NTY <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE R~ <br /> Inspect i <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner. ~~-01-!)6 Au7~30 ICI <br /> Address: <br /> ISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> O:\PROJECTS\PROJ-1\4351\CorrespondencelContractors\4351-20060901ThirdNoteljj.doc APRIL 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.