Page 2 of,2 <br /> Cindy, <br /> Last year we had a pavement preservation project where we changed the limits of work constructed after <br /> the original JN was created. I need to modify the limits associated with the project name so it accurately <br /> reflects the constructed project. Do you know how I would do this? <br /> Thank you, <br /> Matt Rodrigues <br /> Civil Engineer II <br /> City of Eugene -Engineering <br /> PH: 541-682-6036 <br /> FX: 541-682-8410 <br /> <br /> 9/6/2007 <br /> <br />