<br /> Run Date: 07/15/2005 08:19:29 City of Eugene <br /> Engineer's Estimate <br /> Estimate: GJN - Engineering only <br /> Job 93-004359 APRT - SOUTH RAMP REHAB <br /> Line No. Description Quantity Unit Unit Price Amount <br /> <br /> APRT - SOUTH RAMP REHAB <br /> General <br /> 0010. MOBILIZATION LUMPSUM <br /> 0020. CLEARING & GRUBBING LUMPSUM <br /> 0030. TEMP PROTECTN/DIRECTN LUMPSUM <br /> 0040. EROSION CONTROL LUMPSUM <br /> 0050. MOBILIZATION LUMP SUM <br /> 0060. TEMP. PROTECTION AND DIRECTION OF TRAFFIC LUMP SUM <br /> 0070. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE LUMP SUM <br /> 0080. EROSION CONTROL LUMP SUM <br /> 0090. CLEARING AND GRUBBING LUMP SUM <br /> Total General $0.00 <br /> Total APRT - SOUTH RAMP REHAB <br /> APRT - SOUTH RAMP REHAB - Miscellaneous <br /> General <br /> 0010. Engineering Charge 1.00 LUMPSUM $70,000.00 $70,000.00 <br /> Total General $70,000.00 <br /> Total APRT - SOUTH RAMP REHAB - Miscellaneous $70,000.00 <br /> Total GJN - Engineering only $70,000.00 <br /> <br />