Run Date: 8/11/2005 GwM-- <br /> ) Page 1 <br /> City of Eugene ~V,/ <br /> Bid Tabulation <br /> Quote 2005-000025 <br /> JOB #93-004356 <br /> EUGENE AIRPORT EAST GENERAL AVIATION TAXILANE "B" STORM <br /> ENGINEER'S ESTIMATE H & J CONSTRUCTION EUGENE SAND & GRAVEL WILDISH CONSTRUCTION <br /> Line <br /> <br /> No. Description antit Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount <br /> 10 MOBILIZATION 1 LUMPSUM $2,000.00 $2,000.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 $9,000.00 $4,000.00 <br /> 20 TUNNELING, BORING, AND JACKING 25 FOOT $100.00 $2,500.00 $320.00 $8,000.00 $350.00 $8,750.00 $400.00 $10,000.00 <br /> 30 6 INCH PVC PIPS 125 FOOT $30.00 $3,750.00 $21.00 $2,625.00 $33.00 $4,125.00 $35.00 $4,375.00 <br /> 40 CONCRETE MANHOLE, 24 INCH 1 EACH $900.00 $900.00 $1,500.00 $1,500.00 $1,400.00 $1,400.00 $1,300.00 $1,300.00 <br /> G&AZID TOTAL: $9,150.00 <br /> $14,125.00 $17,775.00 $19,675.00 <br /> <br />