Run Date: 04/13/2007 14:55:21 City of Eugene <br /> Estimate -ribution <br /> Estimate: Washington St -6th to 8th -Final <br /> Job 93-004355 PPP WASHINGTON ST; W 6TH AVB - W 8TH AVB <br /> Line No. Description <br /> Quantity Unit Unit Price Amount <br /> PPP WASHINGTON 3T; W 6TH AVS - W 8TH AVS <br /> General <br /> 0470. MOBILIZATION 1.00 LUMPSUM $14,000.00 $14,000.00 <br /> 0480. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMPSUM $9,000.00 $9,000.00 <br /> 0490. TEMPORARY STRIPING 1.00 LUMPSUM $2,500.00 $2,500.00 <br /> 0500. FLAGGERS 49.00 HOUR $35.00 $1,715.00 <br /> 0510. POLICE FLAGGERS 28.30 HOUR $75.00 $2,122.50 <br /> 0520. CITY PROVIDED SPEC INFO SIGNS 4.00 EACH $300.00 $1,200.00 <br /> 0530. EROSION CONTROL 1.00 LUMPSUM $7,000.00 $7,000.00 <br /> 0540. SURFACING STABILIZATION 253.00 CUYD $45.00 $11,385.00 <br /> 0550. MINOR ADJUSTMENT OF MANHOLES 6.00 EACH $600.00 $3,600.00 <br /> 0560. MH REM/REPL FRAME/COVER-ST 3.00 EACH $250.00 $750.00 <br /> 0570. MH REM/REPL FRAME/COVER-WW 1.00 EACH $300.00 $300.00 <br /> 0580. COLD PLANE PVMT REMOVAL, 2" DEEP 1,335.00 SQFT $0.28 $373.80 <br /> 0590. COLD PLANE PVMT REMOVAL, 3" DEEP 13,255.00 SQFT $0.42 $5,567.10 <br /> 0600. COLD PLANE PVMT REMOVAL, 5" DEEP 9,523.00 SQFT $0.28 $2,666.44 <br /> 0610. LEVEL 3, 1/2", DENSE HMAC 437.69 TON $70.00 $30,638.30 <br /> 0620. LEVEL 3, 3/4", DENSE HMAC 356.58 TON $60.00 $21,394.80 <br /> 0630. CONCRETE CURB AND GUTTER 0.00 FOOT $45.00 $0.00 <br /> 0640. PVMT LEGEND, TYPE Al or A2: ARROWS 7.00 EACH $90.00 $630.00 <br /> 0650. PVMT LINE, TYPE Al or A2 428.00 SQFT $4.50 $1,926.00 <br /> 0660. MONO-DIRECTIONAL CRYSTAL TYPE I MARKERS 33.00 EACH $5.00 $165.00 <br /> 0670. THERMOPLASTIC, NON-PROFILE, 90 MIL, EXTRUDED 1.00 LUMPSUM $2,890.00 $2,890.00 <br /> 0680. LEVEL 3, 1/2" HMAC PRICE ADJ- 001 437.69 TON $4.82 $2,109.67 <br /> 0690. LEVEL 3, 3/4" HMAC PRICE ADJ-001 356.58 EACH $4.82 $1,718.72 <br /> 0700. ADJ. WW CLEANOUT-WASHINGTON 1.00 LUMPSUM $361.00 $361.00 <br /> Total General <br /> Total ppp WASHINGTON ST; W 6TH AVB - W 8TH AVE $124,013.33 <br /> $124,013.33 <br /> PPP WASHINGTON ST; W 6TH AVB - W 8TH AVB - Other / Direct <br /> General <br /> 0010. CONTINGENCY LUMPSUM <br /> 0fl20. PAVEMENT TESTING 1.00 EACH $2,278.54 $2,278.54 <br /> 0030. Advertising 1.00 LUMPSUM $0.00 $0.00 <br /> 0040. Printing 1.00 LUMPSUM $199.35 $199.35 <br /> Total General <br /> Total ppp WASHINGTON ST; W 6TH AV$ - W 8TH AVL - Other / Direct 52,477.89 <br /> $2,477.89 <br /> PPP WASHINGTON ST; W 6TH AVB - W 8TH AVB - Miscellaneous <br /> General <br /> 0010. Engineering Charge 1.00 LUMPSUM $30,970.65 $30,970.65 <br /> 0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $0.00 $0.00 <br /> Total General <br /> Total ppp WASHINGTON ST; W 6TH AVE - W 8TH AVB - Miscellaneous 530,970.65 <br /> $30,970.65 <br /> <br /> Total Washington St -6th to 8th -Final $157,461.87 <br /> <br />