Billable Project Costs As Of 07/31 /2006 <br /> 08/30/2006 3:45:13 PM <br /> Page 4 of 106 <br /> Project Billed Acti- Total Amount Billed <br /> Billed vi TranDate TranId Resource Employed uanti $Amount OperOvhd AdmOvhd Transaction Remark <br /> 0409 Pavement Preserv Program Washington St (4355) $920.20 $1,173.34 $2,093.54 <br /> 3636213 Materials Testine $920.20 $1,173.34 $2.093.54 <br /> i <br /> 285C Base aggregates quality control (CE) $203.40 $251.43 $454.83 <br /> 07/152006 e13S6027 Engineering Technician 2 2 L-H $69.36 $100.57 BASE AGG DF'S <br /> 07/152006 e13S6027 PASSENGER VANS 2 H $12.00 BASE AGGDF'S <br /> 07/22/2006 fl3S6037 EngineeringTechnician2 3 L-H $104.04 $150.86 AGG DF'STESTING <br /> 07/222006 fl3S6037 PASSENGER VANS 3 H $18.00 AGG DF'STESTING <br /> 286C Asphaltic concrete quality control (CE) $337.40 $670.48 $1,207.88 <br /> 07/152006 e13S6037 Engineering Technician 2 2 L-H $69.36 $100.57 BASE AC DF'S <br /> 07/IS2006 e13S6037 PASSENGER VANS 2 H $12.00 BASE AC DF'S <br /> 07/222006 fl3S6047 Engineering Technician 2 3 L-H $104.04 $150.86 AC TESTING <br /> 07/222006 fl3S6047 PASSENGER VANS 3 H $18.00 AC TESTING <br /> 07272006 fl3S6013S Engineering Technician 2 2 L-H $46.24 $67.OS <br /> 07/272006 fl3S6013S PASSENGER VANS 2 H $12.00 <br /> 07/272006 fl356045 Engineering Technician 2 LS L-H $52.02 $75.43 AC TESTING <br /> 07/292006 g13S6037 Engineering Technician 2 S.S L-H $190.74 $276.57 AC FD' S <br /> 07/292006 81356037 PASSENGER VANS 5.5 H $33.00 AC FD'S <br /> 304C Standby time (CE) $138.72 $201.14 $339.86 <br /> 07/152006 e13S6017 Engineering Technician 2 4 L-H $138.72 $201.]4 STAND BY TIME CONTR. NOT READY <br /> 322-6 Asphalt sample pickup $40.68 $50.29 $90.97 <br /> 07/292006 g13S6017 Engineering Technician 2 1 L-H $34.68 $50.29 AC SAMPLE P/U <br /> 07292006 g13S6017 PASSENGER VANS 1 H $6.00 AC SAMPLE P/U <br /> <br /> ` <br /> <br />