New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PAF4378
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PAF4378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 1:14:14 PM
Creation date
6/17/2008 11:16:10 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
Yes
External_View
No
GJN
004378
GL_Project_Number
965132
Retention_Destruction_Date
4/19/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br /> <br /> Delta Ponds Bike/Ped Path <br /> Description: Bike/Ped Path undercrossing of Delta Highway, <br /> north of Toyota Dealership on Good Pasture Island Road. y <br /> Bike/Ped Path from Good Pasture to east side of Delta Highway ~ G~?~-~~^~ <br /> Bike/Ped Path crossing improvements on Good Pasture Island Road b` ~ S~ 5~"~ <br /> Federally funded <br /> Coordinate with Army Corp plans on Delta Ponds (see project 4003 maps) <br /> Proposed work: <br /> Hire OBEC Consulting Engineers using pool agreement to: <br /> assist in scoping project - <br /> determining preliminary path alignment with structure <br /> estimating structure costs (design and construction) <br /> Staff to fill out Project prospectus <br /> Cost Estimate: <br /> Structure cost estimating 16 $150.00 $2,400.00 <br /> Project prospectus $8,000.00 <br /> Total $10,400.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.