SYSTEMS DEVELOPMENT CHARGE EXPENDITURE ALLOCATION WORKSHEET <br /> Project Name: North Game Farm Road from East of Old Coburg Road to Springfield City Limits <br /> Project Manager Name: Steve Gallup <br /> Service ID # (e.g. Good Job Number 004181): 4376 Contract # (e.g.2004-0505): Capital Project # (e.g. 905244): <br /> SDC Expenditure Requirements <br /> improvement Fees: May be spent only on capital Improvements included in an adopted Capital Improvement Plan that Increase capacity needed to <br /> provide service for future users, Including those that provide new facilities or Increase the capacity provided by existing facilities. <br /> Wastewater Eligible: Non-assessable components o(projects attributable to future development that drain those portions of pipes within the total area served by <br /> the project. (Quantify portions ofproject that are capacity enhancing; pro-rate design/construction management costs on a proportionate basis.] <br /> Stormwater Eligible: Non-assessable components of pipe or open channel projects attributable to future development that drain impervious surface areas within <br /> the total drainage basin served by the project. (Quantify portions of project that are capacity enhancing by determining the percent of project that will serve new <br /> development: The total existing impervious area of basin divided by the future build-out impervious area of basin equals the percent of project serving existing <br /> development. Subtract from 100% to derive the percentage of project that will serve new development.] <br /> _ _ - <br /> - - - - - _ <br /> Transportation Eligible: Non-assessable components attributable to future development of 1) arterial and collector street projects and related traffic signals, and <br /> 2) off-street bicycle path projects. (Quantify portions of project that are capacity enhancing; pro-rate design/construction management costs on a proportionate <br /> basis. In the case o(major enhancement projects (e.g. Ferry Street Bridge), use analysis to establish the percent of projected trips on the facility that can be <br /> attributed to new development between year of construction and build outJ. <br /> Parks Eligible: Components of Neighborhood or Community park projects attributable to future development. (Quantify portions of project that are capacity <br /> enhancing versus those portions needed to serve existing users. Pro-rate design/construction management costs on a proportionate basis. j <br /> Ralmburaement Fees: May be spent only on capital Improvements Included In an adopted Capital Improvement Plan, including those for new <br /> facilitias and rohabllitatlon of existln facilities. <br /> Wastewater Eligible: Components noted above as well as rehabilitation of existing systems (may also serve existing developrent). <br /> Stormwater Eligible: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br /> _ <br /> - <br /> - - <br /> ransportatlon Eligible: Per Council Resolution No. 4718, reimbursement lees will be budgeted for preservation and maintenance of the existing system <br /> (Council or the Budget Committee may subsequently allocate some or all for a different purpose as allowed bylaw). No transportation reimbursement SDC <br /> revenue is currently attributable to off-street bicycle paths; therefore no reimbursement fee expenditures are allowed for paths. <br /> Parks Eligible: No parks SDC revenue is currently attributable to a reimbursement fee; therefore no reimbursement lee expenditures are allowed. <br /> Allocation Costs & Percentages of Total Project Costs <br /> Project Initiation Phase B/d Phase Flna/ Phase <br /> Wastewater Improve. Fee $ o $ <br /> /0 % $ a/° <br /> Approved Amounts, if different: $ % $ % $ % <br /> Wastewater Reimburse. Fee $ % $ % $ o~ <br /> Approved Amounts, if different: $ % $ % $ % <br /> Stormwater Improve. Fee $ 31,000.00 37% $ ~ $ % <br /> Approved Amounts, If different. $ $ % $ % <br /> Stormwater Reimburse. Fee $ % $ o <br /> /o $ % <br /> Approved Amounts, if different: $ o <br /> Transportation Improve. Fee $ 423,000.00 i 50.4% $ ~ % $ % <br /> _ I <br /> Approved Amounts, if different: $ ~ $ ~ $ % <br /> Transportation Reimburse. Fee $ % $ o <br /> /o $ <br /> Approved Amounts, if different: $ % $ <br /> Parks Improve. Fee $ % $ ~ % $ i % <br /> Approved Amounts, if different $ $ % $ <br /> Parks Reimburse. Fee $ N/A % $ N/A % $ N/A % <br /> Approved Amounts, if different: $ % $ % $ % <br /> Expenditure Allocation Justification <br /> Attach documentation that demonstrates justification of SDC funding of this capital project at project initiation phase as well as at time of any <br /> subsequent revisions of SDC allocation amounts/percentages. <br /> State law requires an annual accounting of SDC expenditures by system at the protect level. An SDC expenditure may be legally challenged for up to <br /> two years after the expenditure. <br /> <br /> a~ <br /> Approved By: <br /> _ _ <br /> - <br /> Date: _ _ <br /> Date: Date: <br /> O:\PROJECTS\PROJ-614376\Design\Budgeh20051010_ SDCAllocation.xls Revised March, 2004 <br /> <br />