<br /> Wetland Determinations Delineations and Documentation of Findings <br /> Mike has received formal training in all aspects of wetland delineation, including intensive delineation training utilizing <br /> the 1987 Corps of Engineers Manual; wetland plant identification and hydric soil geomorphology (please see resume for <br /> additional professional coursework.) In his 10+ years conducting and providing consulting oversight for wetland delineations, <br /> Mike has successfully received both State and Federal concurrence for all of his delineationprojects. <br /> Each of the projects listed below required a complete technical report (Wetland Determination, Wetland Delineation), <br /> either for inclusion within required National Environmental Policy Act documents (Environmental Assessments or <br /> Environmental Impact Statements), or as supporting documents for various regulatory permit applications. The following list is a <br /> sample of the many projects Mike has persor?ally delineated or supervised: <br /> Project Name Coun Stndv Area (Acres) <br /> 1135 Amazon Floodplain Restoration Lane 170 <br /> Amazon Creek (2 parcels) Lane 5 <br /> Bear Creek Restoration Columbia 2 <br /> Canary Road Lane I mile ' <br /> Coburg Local Wetland Inventory Lane 770 <br /> Coyote Creek Wetland Mitigation Bank Lane 47 <br /> Diamond Ridge Subdivision Lane 260 <br /> L?ragonily Bend Habitat Enhancement Proj. Lane 7 <br /> Eugene Airport Expansion Lane ~ 335 <br /> Fern Ridge Bikepath (3 parcels) Lane 15 <br /> Gilham Parent Council Lane 5 <br /> Greenhill Road (a3. Barger Drive Lane 7 <br /> Halsey -Lane Co. Line Linn 12.5 miles <br /> Hwy 238 -Jackson Street Jackson 10 miles' <br /> Legacy Estates Subdivision Lane 18 . <br /> Lorene Highway Bridge Replacement Lane 1.0 <br /> MP 7 /Florence -Eugene Highway Lane 1 <br /> North Jefferson -North Albany Linn 5 miles <br /> Oakles Developments, Inc. Lane 264 <br /> Oregon Coast Highway ®131st Lincoln 2 <br /> Parsons Creek Substation (EPUD) Lane 10 <br /> PeaceHealth Riverbend Hospital Lane 55 <br /> Pleasant Valley - Greentimber Tillamook 1 mile <br /> Royal Avenue TGM Project Lane 220 <br /> Silverton Rd -State St Marion 5 miles <br /> Siuslsw River Road Bridge Lane S <br /> Spencer Creek Bridge LincoM 10 <br /> Springfield Quarry Lane 10 <br /> Stone Forest Industries Lane 55 <br /> Tangent Local Wetland Inventory Lane 2200 <br /> W11th - GarReld (Phase 1) Lane 1.5 miles <br /> WI Ith - NCL (Phase 1) (Eugene Beltline Lane 47 <br /> Mitigation Site) <br /> Wetland and Stream Restoration Desi¢n and Protect Permittin¢ <br /> With his background in Landscape Architecture and Biology, Mike brings to a mitigation design project a depth ~of <br /> understanding of landscape processes and habitat specifics. Mike has developed a strong reputation as an environmental <br /> designer, integrating multiple needs and constraints to optimize the functioning of mitigation designs. Additionally, M~7ce has <br /> extensive experience in developing Joint Permit Applications for removal / fill projects, and has established a good working <br /> relationship with many of his regulatory and review agency peers. <br /> The following is a sample list of mitigation design projects Mike has successfully conducted, many of which also <br /> required permits. <br /> <br />