Run Date: OS/23/2007~08:18:25 City of Eugene ~ ~ C: l <br /> ~ f\ ~ ~ Enginee Estimate <br /> Estimate: po ~ bid opening <br /> Job 93-004375 SORREL WAY STORM IMPROVEMENTS <br /> Line No. Description Quantity Unit Unit Price ~ <br /> Amount <br /> SORREL WAY STORM IMPROVEMENTS <br /> General <br /> 0010. MOBILIZATION 1.00 LUMPSUM $21,775.00 $21,775.00 <br /> 0020. EROSION CONTROL 1.00 LUMPSUM $800.00 $800.00 <br /> 0030. TEMP PROTECTN/DIRECTN 1.00 LUMPSUM $4,000.00 $4,000.00 <br /> 0040. SPEED HUMP COMPLETE 1.00 EACH $1,400.00 $1,400.00 <br /> 0050. SEDIMENTATION MANHOLE 1.00 EACH $2,900.00 $2,900.00 <br /> 0060. CONSTRUCT 60" MANHOLE OVER EXISTING PIPE 1.00 EACH $3,500.00 $3,500.00 <br /> 0070. MH FLAT TOP - STM 5.00 EACH $1,900.00 $9,500.00 <br /> 0080. MH 4"-24" PIPE - STM 3.00 EACH $1,800.00 $5,400.00 <br /> 0090. CATCH BASIN TRAPS 15.00 EACH $300.00 $4,500.00 <br /> 0100. CONVERT EXISTING DRYWELL TO CB 4.00 EACH $1,250.00 $5,000.00 <br /> 0110. CB, STD W/BIKE PRF GRATE 7.00 EACH $1,225.00 $8,575.00 <br /> 0120. REMOVAL OF DRYWELL 3.00 EACH $125.00 $375.00 <br /> 0130. PLUG AND ABANDON EXISTING PIPE 1.00 EACH $140.00 $140.00 <br /> 0140. TRENCH RESURFACING 4" LEVEL 2, 1/2" DENSE HMA 17,500.00 SQFT $1.90 $33,250.00 <br /> 0150. DIAMOND GRINDING 0"-2" DEPTH 100.00 SQFT $15.50 $1,550.00 <br /> 0160. REPLACE EXISTING ROLLED CURB 150.00 FOOT $32.00 $4,800.00 <br /> 0170. CONCRETE 4" 350.00 SQFT $11.90 $4,165.00 <br /> 0180. 10 INCH STORM DRAIN PIPE 258.00 FOOT $39.70 $10,242.60 <br /> 0190. 12 INCH STORM DRAIN PIPE 590.00 FOOT $42.50 $25,075.00 <br /> 0200. 18 INCH STORM DRAIN PIPE 148.00 FOOT $53.00 $7,844.00 <br /> 0210. 24 INCH STORM DRAIN PIPE 981.00 FOOT $67.00 $65,727.00 <br /> 0220. 10 INCH CLASS III CONCRETE STORM DRAIN PIPE 231.00 FOOT $58.00 $13,398.00 <br /> 0230. 12 INCH CLAS III CONCRETE STORM DRAIN PIPE 274.00 FOOT $62.00 $16,988.00 <br /> 0240. ADJUST WW SERVICE 150.00 FOOT $28.00 $4,200.00 <br /> 0250. TEMPORARY TYPE ORANGE PLASTIC MESH FENCE 950.00 FOOT $1.00 $950.00 <br /> 0260. TREE PROTECTION ROOT ZONE EXCAVATION 100.00 FOOT $21.00 $2,100.00 <br /> Total General <br /> Total SORREL WAY STORM IMPROVEMENTS $258,154.60 P <br /> $258,154.60 <br /> SORREL WAY STORM IMPROVEMENTS - Other / Direct <br /> General <br /> 0010. Contingency 5~ of Contract $12,907.73 <br /> 0020. Advertising 1.00 LUMPSUM $500.00 $500.00 <br /> 0030. test 1.00 LUMPSUM $2,000.00 $2,000.00 <br /> Total General <br /> Total SORREL WAY STORM IMPROVEMENTS - Other / Direct $15,407.73 <br /> $15,407.73 <br /> SORREL WAY STORM IMPROVEMENTS - Miscellaneous <br /> General <br /> 0010. Engineering Charge 20~ of Direct ~ ~ $54,712.47 <br /> 0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $500.00 $500.00 <br /> Total General <br /> Total SORREL WAY STORM IMPROVffid8N'PS - Miscellaneous $55,212.47 <br /> $55,212.47 <br /> <br /> Total post bid opening <br /> $328,774.80 ~ ~ <br /> 3z~ N~ , 531 <br /> s~ ~3~ <br /> <br />