<br /> w• <br /> Reconstruct Taxiwa s ECHOIA5 <br /> Sco in estimate 0 911 5/2 0 0 5 <br /> _95,000 s uare feet <br /> Item Units $IUnit Extended <br /> Mobilization - 10% LS 1 $ 66,248.15 $ 66,248.15 <br /> Erosion control LS 1 $ 2,000.00 $ 2,000.00 <br /> Safe /Securi LS 1 $ 12,000.00 $ 12,000.00 <br /> Excavation CY 8210 $ 15.00 $ 123,148.15 <br /> Geotextile Fabric SY 10556 $ 1.00 $ 10,555.56 <br /> 6" crushed rock SY 10556 $ 5.00 $ 52,777.78 <br /> 14" Cement Treated Base SY 10556 $ 18.00 $ 190,000.00 <br /> 8" As halt Concrete TN 4750 $ 43.00 $ 204,250.00 <br /> Underdrains LF 2500 $ 20.00 $ 50,000.00 <br /> Stri in SF 2500 $ 1.00 $ 2,500.00 <br /> Recessed Markers EA 20 $ 125.00 $ 2,500.00 <br /> Ad'ust Ed a Li hts EA 15 $ 850.00 $ 12,750.00 <br /> $ 728,729.63 Subtotal <br /> En ineerin - 13.6% $ 99,107.23 <br /> Contin enc - 10% $ 72,872.96 <br /> Testin $ 7,000.00 <br /> Advertisin $ 1,500.00 <br /> Admin $ 6,000.00 <br /> $ 915,209.82 Total <br /> <br />