|
J
<br /> Run Date: 4/11/2006
<br /> Page 1
<br /> City of Eugene
<br /> Bid Tabulation
<br /> 2006-000001
<br /> Job No. 93-004371
<br /> Eugene Airport 2006 Taxiway Rehabilitation Echo and Alpha 5
<br /> Engineer's Estimate Wildish Construction Co. Delta Construction Eugene Sand & Gravel Inc.
<br /> Line
<br /> No. Description uantit Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
<br /> 10 MOBILIZATION 1 LUMPSUM $64,628.87
<br /> 20 EROSION CONTROL $64,628.87 $80,000.00 $60,000.00 $200,121.00 $200,121.00 $200,000.00
<br /> 1 LUMPSUM $2,000.00 $2,000.00 $1,000.00 $200,000.00
<br /> 30 AIRPORT SAFETY AND SECURITY $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00
<br /> 1 LUMPSUM $12,000.00 $12,000.00 $100,000.00 $100,000.00 $88,579.00 $88,579.00 $4,000.00 $4,000.00
<br /> 44 TEMPORARY STRIPING 1000 LINFT $2.50 $2,500.00
<br /> 50 UNCLASSIFIED EXCAVATION $2'00 $2,000.00 $1.90 $1,900.00 $1.90 $1,900.00
<br /> 7011 CUYD $18.00 $126,198.00
<br /> 60 OVER EXCAVATION $17.50 $122,692.50 $18.00 $126,198.00 $17.30 $121,290.30
<br /> 1500 CUYD $30.00 $45,000.00 $35.00 $52,500.00
<br /> 70 GEOTEXTILE FABRIC 9120 SQYD $35.00 $52,500.00 $40.00 $60,000.00
<br /> $l.oa $9,lzo.oo $l.oo $9,120.00 $0.90 $a,zos.oo
<br /> 80 CRUSHED ROCK, 6" 9120 SQYD $6.00 $1.00 $9,120.00
<br /> 90 CEMENT-TREATED BASE COURSE $54,720.00 $6.00 $54,720.00 $3.50 $31,920.00 $6.60 $60,192.00
<br /> 9103 SQYD $20.00 $182,060.00 $17.50 $159,302.50
<br /> 100 2.5" COLD PLANE REMOVAL 2026 SQYD $13.90 $126,531.70 $19.00 $172,957.00
<br /> 110 BITUMINOUS PAVEMENT $4.OD $8,112.00 $4.00 $8,112.00 $3.00 $6,084.00
<br /> 4426 TON $44.00 $194,744.00 $4.80 $9,734.40
<br /> 120 ADJUST STORM STRUCTURE $40.00 $177,040.00 $50.50 $223,513.00 $50.50 $223,513.00
<br /> 2 EACH $850.00 $1,700.00 $1,750.00 $3,500.00 $1,600.00 $3,200.00 $2,000.00 $4,000.00
<br /> 130 SHOULDER FILL AND GRADING 125 TON $20.00
<br /> 140 PERMANENT STRIPING AND MARKING 2400 SQFT $2,500.00 $30.00 $3,750.00 $26.00 $3,250.00 $60.00 $7,500.00
<br /> $1.00 $2,400.00 $2.00 $4,800.00 $1.85 $4,440.00 $1.85
<br /> 150 PERIMETER UNDERDRAIN 569 LINFT $30.00 $4,440.00
<br /> 160 AIRCRAFT RATED MH $17,070.00 $33.00 $18,777.00 $19.00 $10,811.00 $17.00 $9,673.00
<br /> 1 LUMPSUM $4,000.00 $4,000.00 $4,000.00 $4,000.00 $2,400.00 $2,400.00 $5,500.00 $5,500.00
<br /> 170 RETRO-REFLECTIVE MARKER 9 EACH $130.00
<br /> 180 REPLACE 1D" RCP $1,170.00 $400.00 $3,600.00 $400.00 $3,600.00 $400.00 $3,600.00
<br />
<br /> TOTAL: 20 LINFT $300.00 $6,000.00 $75.00 $1,500.00 $60.00 $1,200.00 $170.00 $3,400.00
<br /> $735,922.87 $606,414.00 $895,455.70
<br /> $901,819.70
<br />
<br />
|