|
Run Date: 05/26/2006 08:48:35 City of Eugene
<br /> Estimate Distribution
<br /> Estimate: After Bid Opening
<br /> Job 93-004371 AIRPORT ECHO AS RECONSTRUCTION
<br /> Line No. Description Quantity Unit Unit Price Amount
<br />
<br /> AIRPORT ECHO A5 RECON3TRUCTION
<br /> General
<br /> 0010. MOBILIZATION 1.00 LUMPSUM $80,000.00 $80,000.00
<br /> 0020. EROSION CONTROL 1.00 LUMPSUM $1,000.00 $1,000.00
<br /> 0030. AIRPORT SAFETY AND SECURITY 1.00 LUMP SUM $100,000.00 $100,000.00
<br /> 0040. TEMPORARY STRIPING 1,000.00 LINFT $2.00 $2,000.00
<br /> 0050. UNCLASSIFIED EXCAVATION 7,011.00 CUYD $17.50 $122,692.50
<br /> 0060. OVER EXCAVATION 1,500.00 CUYD $35.00 $52,500.00
<br /> 0070. GEOTEXTILE FABRIC 9,120.00 SQYD $1.00 $9,120.00
<br /> 0080. CRUSHED ROCK, 6" 9,120.00 SQYD $6.00 $54,720.00
<br /> 0090. CEMENT-TREATED BASE COURSE 9,103.00 SQYD $17.50 $159,302.50
<br /> 0100. 2.5" COLD PLANE REMOVAL 2,028.00 SQYD $4.00 $8,112.00
<br /> 0110. BITUMINOUS PAVEMENT 4,426.00 TON $40.00 $177,040.00
<br /> 0120. ADJUST STORM STRUCTURE 2.00 EACH $1,750.00 $3,500.00
<br /> 0130. SHOULDER FILL AND GRADING 125.00 TON $30.00 $3,750.00
<br /> 0140. PERMANENT STRIPING AND MARKING 2,400.00 SQFT $2.00 $4,800.00
<br /> 0150. PERIMETER UNDERDRAIN 569.00 LINFT $33.00 $18,777.00
<br /> 0160. AIRCRAFT RATED MH 1.00 LUMPSUM $4,000.00 $4,000.00
<br /> 0170. RETRO-REFLECTIVE MARKER 9.00 EACH $400.00 $3,600.00
<br /> 0180. REPLACE 10" RCP 20.00 LINFT $75.00 $1,500.00
<br /> Total General $806,414.00
<br />
<br /> Total AIRPORT ECHO AS RECONSTRUCTION
<br /> $806,414.00
<br />
<br /> AIRPORT ECHO A5 RECONSTRUCTION - Other / Direct
<br /> General
<br /> 0010. test 1.00 LUMPSUM $7,000.00 $7,000.00
<br /> 0020. Advertising 1.00 LUMPSUM $2,500.00 $2,500.00
<br /> 0030. Administration 1.00 LUMPSUM $3,000.00 $3,000.00
<br /> Total General $12,500.00
<br />
<br /> Total AIRPORT ECHO AS RECONSTRUCTION - Other / Direct $12,500.00
<br />
<br /> AIRPORT ECHO A5 RECONSTRUCTION - Miscellaneous
<br /> General
<br /> 0010. Engineering Charge 1.00 LUMPSUM $99,200.00 $99,200.00
<br /> Total General $99,200.00
<br />
<br /> Total AIRPORT 8CH0 AS RECONSTRUCTION - Miscellaneous $99,200.00
<br /> Total After Bid Opening $918,114.00
<br />
<br />
|