FROM :ROGGE CONSTRUCTION FAX N0. :541 741-8134 Aug. 25 2006 03:44PM P2 <br /> 7T~uma.~ ii'ngge C:onstreictivrt <br /> (~'(.'R a 110976 <br /> 1278 Humidivn ,,S"t Rh (541) 741-8135 <br /> S1~rin~e%!, ()R 97477 (:'eld (541) 513-IU75 <br /> Invoice Date: August 25, 2006 <br /> 3 . <br /> Contact: Steve Gallup a2oU <br /> City of Eulenc ~,~yu_ _ w5~3 <br /> Job Location; 2313 Hilyard St ~°-°~'3 <br /> ~~~T~AL_~.~C <br /> Job Number: <br /> Pour Date: August 25, 2006 <br /> Dimensions: I O ft by S ft (city) and 19 x S and 5 x 5 (homeowner) <br /> Depth: d inches <br /> Mix: CG3600 (equiv to 4500 psi) <br /> . Notes: Removed cracked and uplifted sidewalk. Roots needed to be removed <br /> were too massive to take and leave tree standing. Tree a,nd all roots were removed, along <br /> with sub grade (nn rock) to make room for 2 inches of compacted gravel and 4 inches <br /> concrete. Last four feet. of new sidewalk to the south were poured as transition in order to <br /> have sidewalk drain towards the street rather than homeowner's steps. Homeowner <br /> inspected sidewalk before I covered, was happy with the result, and immediately paid the <br /> agreed upon price of $750. <br /> ><nvoice Amount: $52S <br /> TA: ~ a~~i F G`u/-~ Zg d <br /> corm No. T <br /> 1 e~ ~ ~O <br /> ~n~re <br /> 0~3-25-06 A11 :20 I N <br /> <br /> ~1rr <br /> ' U <br /> 0~-28-06 A22-319NV <br /> 08/25/2006 FRI 15:12 [TX/RX NO 7677] I~j002 <br /> <br />