Billable Project Costs As Of 07/31 /2006 <br /> 08/30/2006 3:45:14 PM Page 8 vC 106 <br /> Project Billed Acti- Total Amount Billed <br /> Billed ~ vi TranDate TranId Resource Employed uanti Amount OperOvhd AdmOvhd Transaction Remark <br /> <br /> 0413 Hilyard St Improvements (4369) $171.72 $201.15 $372.87 <br /> 3636213 Materials Testine $171.72 $201.15 $372.87 <br /> 322-6 Asphalt sample pickup $171.72 3201.15 3372.87 <br /> 07(22/2006 fl356017 Engineering Technician 2 1 L-H $34.68 $50.29 P/U AC SAMPLE FOR TESTING ~ <br /> 07/22/2006 fl356017 PASSENGER VANS 1 H $6.00 P/U AC SAMPLE FOR TESTING <br /> 07/24/2006 fl356092 Engineering Technicia,i 2 1.5 L-H $34.68 $50.29 P/U AC SAMPLE (BASE AND TOP LET) <br /> 07/24/2006 fl356092 PASSENGER VANS 1.5 H $9.00 P/U AC SAMPLE (BASE AND TOP LIFT) <br /> 07/25/2006 fl356093 Engineering Technician 2 3 L-H $69.36 $100.57 P/U AC SAMPLE (BASE AND TOP LIFT) <br /> 07/25/2006 fl356093 PASSENGER VANS 3 H $18.00 P/U AC SAMPLE (BASE AND TOP LIFT) <br /> - <br /> <br />