PUBLIC IMPROVEMENT CONTRACT FOR USE WITH <br /> OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION <br /> BETWEEN: The City of Eugene, an Oregon p <br /> Municipal Corporation (City) ~ <br /> 7 <br /> AND: Tom Ayres General Contractor (Contractor) <br /> I <br /> CONTRACT NO.: 2007 - 03 <br /> JOB NO.: 4388 <br /> PROJECT: GOLDEN GARDENS PARK BRIDGE OVER THE A-2 CHANNEL <br /> R <br /> RECITALS <br /> Contractor was the successful bidder for the contract construction of the public improvement <br /> project described in the plans and specifications for the project that were included in the bid documents <br /> and the Oregon Standard Specifications for Construction which form a part of this contra~? ~ <br /> i <br /> A~--~"~ 7 <br /> 1. The Contract. The Contract between the 1~~ <br /> together with all ~ ~ ~ i~ ~ finition <br /> Document and its exhibits, <br /> of the "Contract" under the 2002 Oregon Sts ~ e <br /> <br /> ~i,,, Oregon Department of Transportation, as me ons, <br /> Supplemental Specifications for the Project a. C,L~L ~ ~ <br /> Documents (all specifications and Special Pro ~Zl..~ . J 'erred <br /> to herein as the "Specifications"). In addition, ~ II be z; <br /> deemed to incorporate ail reports, records, law ~ lil 1 <br /> documents. <br /> This Document includes and incorporates th <br /> Exhibit A -City's Standard Condition: ' <br /> Exhibit 6 -Pro osal Documents <br /> P <br /> Exhibit C -Certificate of Bidder/Contra r, <br /> kl <br /> 2. Definitions. Unless otherwise specifically defined i _ .,,,u~nent, all capitalized terms which are <br /> not proper nouns shall have the meanings assigned thereto in the Specifications. <br /> 3. Project. The project is generally described as: <br /> GOLDEN GARDENS PARK BRIDGE OVER THE A-2 CHANNEL <br /> 4. Work to be Performed. Contractor agrees to furnish, as the "Work" alt services, labor, materials and 'y <br /> equipment which are described as the Contractor's responsibility in the Plans and Specifications, as ! <br /> the same may be modified in accordance with the Contract, and to construct the improvement ' i <br /> described therein (the Project), all according to the provisions of the Contract. All parts of the Work <br /> are the sole responsibility of Contractor. <br /> oRi~~N~~ <br /> Public Improvement Contract for Use with Oregon Standard Specifications -Page 1 <br /> (Revised February 2004) <br /> <br />