Page 3
<br /> Run gate: 08/31/2006 14:57:21
<br /> City of Eugene
<br /> Contract Preliminary Progress Payment
<br /> Payment No 001
<br /> Contractor; Tom Ayres General Contractor Original Contract: $191,294.50
<br /> Job 93-004388 Current Amount: $191,294.50
<br /> Contract No: 2007-OD003 Contract Award Date: 07/24/2006
<br /> PO 2007100066 Completion Date: 11/21/2006
<br /> Assessable: No
<br /> Line Descri lion Current Contract Amount Quantityd Payment Cumulative Totals 2 CompleCe
<br /> - p Last Chng Ord Unit Price Vnit Measure Quantity Amount Quantity Amount
<br /> 0180 LOOSE RZpRAP, SPECIAL CLASS 20 $50.00 TON 22.000 $1,100.00 25.540 $1,277.00 25.540 $1,277.00 116.00
<br /> $5,000.00 LUMPSUM 1.000 $5,000.00 1.000 $5,000.00 1.000 $5,000.00 10 .00
<br /> 0190 BRIDGE REMOVAL WORK
<br /> 0200 STRUCTURE EXCAVATION $1,SD0.00 LUMPSUM 1.000 $1,500.00 1.000 $1,500.00 1.000 $1,500.00 100.00
<br /> 0230 GRANULAR STRUCTURE BACKFILL $1,000.00 LUMPSUM 1.000 $1,000.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0220 FURNISH PILE DRIVING EQUIPMENT $9,500.00 LUMPSUM 1.000 $9,500.00 1.000 $9,500.00 1.000 $9,500.00 100.00
<br /> 0230 FURNISH PP 12.75 X 0.375 STEEL $32.00 FOOT 320.000 $10,240.00 304.000 $9,728.00 304.000 $9,728.00 95.00
<br /> 0290 DRIVE pp 12.75 X 0.375 STEEL P $250.00 EACH 8.000 $2,000.00 B.OOD $2,000.00 8.000 $2,000.00 100.00
<br /> 0250 PP 12.75 X 0.375 STEEL PILE Sp $250.00 EACH 2.000 $500-00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0260 REINFORCEMENT
<br /> $3,500.00 LUMPSUM 1.000 $3,500.00 1.000 $3 500.00 1.000 $3,500.00 10 .
<br /> 0270 STRUCTURAL, CONCRETE, CLASS 360 $12,500.00 LUMPSUM 1.000 $12,500.00 1.000 $12,500.00 1.000 $12,500.00 100.00
<br /> $220.00 FOOT 288.000 $63,360.00 288.000 $63,360.00 288.000 $63,360.00 M 300. 0
<br /> 0280 26 INCH PRECAST PRESTRESSED SL
<br /> 0290 3 TUBE STEEL RAIL
<br /> $29,500.00 LUMPSUM 1.000 $29,500.00 0.000 $0.00 0.000 $0.00 M 0.0
<br /> 0300 AGGREGATE BASE
<br /> $28.00 TON 203.000 $3,654.00 0.000 $0.00 O.D00 $0.00
<br /> 0310 PERMANENT SEEDING, METHOD 1 OR $4,000.00 ACRE 0.200 $800.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0320 ACCESS GATE
<br /> $2,000.00 EACH 1.000 $2,000.00 0.000 $0.00 0.000 $0.00 0.
<br /> $3.50 FOOT 740.000 $2,590.00 713.000 $2,495.50 713.000 $2,495.50 96.
<br />
<br /> 0330 CONSRUCTTON 20NE FENCING
<br /> $191,294.50 $148,735.00 $148,735.00