} } <br /> ' Page 3 <br /> <br /> Run Date: 10/03/2006 15:19:06 City of Eugene <br /> ' Contract Preliminary Progress Payment <br /> Payment No 002 <br /> Original Contract: $191,294.50 <br /> Contractor: Tom Ayres General Contractor Current Amount: $191,294.50 <br /> Job 93-004388 Contract Award Date: 07/24/2006 <br /> Contract No: 2007-00003 Completion Date: 11/21/2006 <br /> p0 2007100066 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> antit Amount Quantity Amount Quantity Amount <br /> Line Description Last Chug Ord Unit Price Unit Measure Qu Y <br /> 0180 LOOSE RIPRAP, SPECIAL CLASS 20 $50.00 TON 22.000 $1,100.00 0.000 $0.00 25.540 $1,277.00 116.00 <br /> 0190 BRIDGE REMOVAL WORK $5,000.00 LUMPSUM 1.000 $5,000.00 0.000 $0.00 1.000 $5,000.00 100.00 <br /> 0200 STRUCTURE BXCAVATZON $1,500.00 LUMPSUM 1.000 $1,500.00 0.000 $0.00 1.000 $1,500.00 100.00 <br /> 0210 GRANULAR STRUCTURE BACKFILL $1,000.00 LUMPSUM 1.000 $1,000.00 1.000 $1,000.00 1.000 $1,000.00 100.00 <br /> 0220 FURNISH PILE DRIVING EQUIPMENT $9,500.00 LUMPSUM 1.000 $9,500.00 0.000 $0.00 1.000 $9,500.00 100.00 <br /> 0230 FURNISH PP 12.75 X 0.375 STEEL $32.00 FOOT 320.000 $10,240.00 0.000 $0.00 304.000 $9,728.00 95.00 <br /> p240 DRIVE PP 12.75 X 0.375 STEEL P $250.00 EACH 8.000 $2,000.00 0.000 $0.00 8.000 $2,000.00 100.00 <br /> 0250 PP 12.75 X 0.375 STEEL PILE SP $250.00 EACH 2.000 $500.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0260 REINFORCEMENT $3,500.00 LUMPSUM 1.000 $3,500.00 0.000 $0.00 1.000 $3,500.00 100.00 <br /> $12,500.00 LUMPSUM 1.000 $12,500.00 0.000 $0.00 1.000 $12,500.00 100.00 <br /> 0270 STRUCTURAL CONCRETE, CLASS 360 <br /> 0260 26 INCH PRECAST PRESTRESSED SL $220.00 FOOT 288.000 $63,360.00 0.000 $0.00 288.000 $63,360.00 M 100.00 <br /> 0290 3 TUBfi STEEL RAIL $29,SOD.00 LUMPSUM 1.000 $29,500.00 1.000 $29,500.00 1.000 $29,500.00 M 100.00 <br /> 0300 AGGREGATE EASE $18-00 TON 203.000 $3,654.00 194.817 $3,506.71 194.817 $3,506.71 96.00 <br /> 0310 PERMANENT SEEDING, METHOD 1 OR $4,000.00 ACRB 0.200 $800.00 0.000 $0.00 0.000 $0.00 0.00 <br /> $2,000.00 EACH 1.000 $2,000.00 1.125 $2,250.00 1.125 $2,250.00 113.00 <br /> 0320 ACCESS GATE <br /> 0330 CONSRUGTION ZONE FENCING $3.50 FOOT 740.000 $2,590.00 0.000 $0.00 713.000 $2,495.50 96.00 <br /> $191,294.50 $39,589.46 $188,324.46 <br /> <br />