New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4388 OBEC Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4388 OBEC Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:56:02 PM
Creation date
6/16/2008 3:42:08 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004388
GL_Project_Number
975142
Identification_Number
2006100348
COE_Contract_Number
2006-00229
Retention_Destruction_Date
11/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE~CONTRACT #2006-0022 <br /> Mr. Steve Gailup Amendment One <br /> June 6, 2006 Page 2 of 3 - Ex~ii bi t A <br /> Page 2 <br /> SCOPE OF WORK <br /> At this time we have identified the following tasks as the scope of work for this project: <br /> TASK 5 -CONSTRUCTION ENGINEERING ASSISTANCE <br /> It Is anticipated that the qty will be administering the construction contract, provide day-today <br /> inspection, and provide construction surveying and payment estimate review for the bridge with <br /> office engineering support provided by OBEC. OBEC will provide the following tasks and <br /> deliverables anticipated for the construction phase of the project: <br /> • Attend and participate in a preconstruction meeting scheduled and conducted by the City. <br /> ¦ Structural shop drawing review (precast slabs, pile hammer and- piling, concrete mIx <br /> designs, reinforcement, rail systems, etc.) <br /> ¦ Inspect fabrication of the precast slabs at the precast plant <br /> ¦ Inspect the pile driving and erection of precast slabs <br /> ¦ Resolve structural bridge related field issues arising from the work. <br /> ¦ Final "As-Built" Drawings submitted to the City Electronically. <br /> ESTIMATED FEE <br /> The attached spreadsheet indicates the anticipated hours and assoaated fee required to complete <br /> the tasks as ouiiined above. At this time OBEC proposes to perform the work on a time-and- <br /> material-basis not-to-exceed $12,648 as shown on the fee spreadsheet. Rates are based on <br /> OBEC's current City of Eugene Personal Services Contract for Architecture and Engineering. <br /> SCHEDULE <br /> It is our understanding that the City desires to bid this project in June of 2006. <br /> We hope this proposal provides the City of Eugene with the required information. Please do not <br /> hesitate to call if you have any questions or need additional information. <br /> Sincerely, <br /> Peter G. Slocum, P.E., S.E. <br /> Senior Project Engineer <br /> PGS/spc <br /> <br /> Enclosures <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.