New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4384 Pavement Services Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4384 Pavement Services Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 9:58:46 PM
Creation date
6/16/2008 3:14:48 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004384
GL_Project_Number
965584
Identification_Number
2006100381
COE_Contract_Number
2006-00232
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Matt Rodrigues <br /> February 27, 2006 <br /> Page 3 <br /> developed for reconstruction. We will prepare technical memorandum reports for each roadway <br /> segment to present our 1•indings and recommendations. These reports will include design <br /> documentation, distress maps and typical sections depicting our design recommendations. The <br /> backcalculated subgrade resilient modulus, effective structural number of the existing pavement and the <br /> required structural number (based on the traffic loading) for each test location will be plotted versus the <br /> street stationing and included in the design reports. <br /> Field Review Meeting <br /> We have assumed one meeting with City staff for field review of the projects. <br /> Project Schedule <br /> Our estimated schedule for the work is shown below in Table 2. This schedule is preliminary since the <br /> date of Notice to Proceed is uncertain and some adjustment may be needed in the schedules shown <br /> below for the various tasks depending upon when the Notice to Proceed is issued. However, our <br /> design reports will be delivered prior to December 1, 2006 provided that we receive Notice to Proceed <br /> by July 3, 2006 and receive the data to be provided by the City prior to August 4, 2006. <br /> Prelnnin Project Schedule -Table 2 <br /> Task Time from "Notice to Proceed" <br /> Start Date Estimated Com letion Date <br /> Field Reconnaissance 1 week 3 weeks <br /> FWD Testin 3 weeks 5 weeks <br /> Visual Surve 4 weeks 6 weeks <br /> Corin Ex locations ~ 6 weeks 8 weeks <br /> Desi n Anal sis 8 weeks 12 weeks <br /> Re its 10 weeks 14 weeks <br /> Project Fee <br /> We propose to accomplish the above described work scope on a time and expenses basis in accordance <br /> with the rate schedule m our current Personal Services Contract with the City (2003-00216 Amendment <br /> #8). Our estimated fee for this work is $70,749 as itemized in Table 3, which we agree not exceed <br /> without your prior authorization. In case it becomes necessary to adjust the scope of projects included <br /> in this proposal, the not to exceed fee can be adjusted accordingly at the unit rate of $2.10 per <br /> centerline foot of street for increases or decreases in project scope within t 30% of the total length of <br /> the street segments now included in the project list (31,559 lineal ft). <br /> Fee Estimate -Table 3 <br /> Labor Itemization <br /> lassification Hourl Rate Estimated Hours Labor Fee <br /> rinci al $136.72 40 $5,469 <br /> ro'ect En ineer $100.69 313 $31,516 <br /> WD/Senior Technician $62.53 108 $6,753 <br /> raftin $58.29 36 $2,098 <br /> lerical $58.29 8 $466 <br /> abor Subtotal 505 $46,303 <br /> <br /> Ex ense Itemization <br /> tem asis Unit Rat Quanti Total <br /> isual Surve Per Diem a $11 2 $220 <br /> WD Testin r. $180. 32 $5,760 <br /> WD Mobilization 'le $1. 440 $440 <br /> WD Per Diem , ay $110. 5 $550 , <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.