• Proposal Cost Breakdown Supplemental Sheet <br /> Cumulativc <br /> Quantity Uniis Rate Subtotals Toial <br /> Project Management <br /> Project Engineer 14 hours S 113.00 S 1,582.00 <br /> Mileage 150 miles S 0.60 S 90.00 <br /> Per Diem 0 days S 110.00 S <br /> S 1,672.00 S 1,672.00 <br /> Distress Survey for All Roads <br /> Project Engineer 20 hours S 113.00 S 2,260.00 <br /> Mileage 300 miles S 0.60 S 180.00 <br /> S 2,440.00 S 4,112.00 <br /> FWD Mobilization and Per Diem <br /> Staff Engineer III 6 hours S 103.00 S 618.00 <br /> Mileage 300 miles S 0.60 S 180.00 <br /> Per Diem S days S 110.00 S 550.00 <br /> S i , 348.00 S 5,460.00 ' <br /> Coring Mobilization and Per Diem <br /> Staff Engineer III 6 hours S 103.00 S 618.00 <br /> Mileage 300 miles S 0.60 S 180.00 <br /> Per Diem 9 days S 110.00 S 990.00 <br /> S 1,788.00 S 7,248.00 <br /> Ol 5th Avenue from Washington to Blair 2,067 feet Cores 4 <br /> On Site FWD testing and Coring FWD 41 <br /> FWD Unit (includes staff engineer) 0.35 each S 1,500.00 S 525.00 <br /> Staff Engineer III (core logging) 5.00 hours S 103.00 S 515.00 <br /> Flagging Subcontractor (includes 12% markup) 1.20 each S 750.00 S 900.00 <br /> Drilling Subcontractor (includes 12% markup) 0.55 each S 1,250.00 S 687.50 <br /> Data Reduction and Analysis <br /> ProjeR Engineer 6.00 hours S 113.00 S 678.00 <br /> Laboratory Testing <br /> Moisture Content 6.00 each S 12.00 S 72.00 <br /> Wash Sieve Analysis 2.00 each S 80.00 S 160.00 <br /> Atterberg Limits 1.00 each S 105.00 S 105.00 <br /> Report Preparation <br /> Principal Engineer (review) 1.50 hour S 159.00 S 238.50 <br /> Project Engineer 7.00 hours S 113.00 S 791.00 <br /> Drafting 2.50 hours S 83.00 S 207.50 <br /> Project Assistant 3.00 hours S 72.00 S 216.00 <br /> Support Staff 1.50 hours S 55.00 S 82.50 <br /> Subtotal S 5,178.00 S 12,426.00 <br /> 02 Bailey Hiil Road from 18th to Bertelsen 6,007 feet Cores 10 <br /> On Site FWD testing and Coring FWD 120 <br /> FWD Unit (includes staff engineer) 0.80 each S 1,500.00 S 1,200.00 <br /> Staff Engineer III (core logging) 13.00 hours S 103.00 S 1,339.00 <br /> Flagging Subcontractor (includes 12% markup) 2.10 each S 750.00 S 1,575.00 <br /> Drilling Subcontractor (includes 12%markup) 1.40 each S 1,250.00 S 1,750.00 <br /> Data Reduction and Anatysis <br /> Project Engineer 12.00 hours S 113.00 S 1,356.00 <br /> Laboratory Testing <br /> Moisture Content 1 1.00 each S 12.00 S 132.00 <br /> Wash Sieve Analysis 3.00 each S 80.00 S 240.00 <br /> Atterberg Limits 2.00 each S 105.00 S 210.00 <br /> Report Preparation <br /> Principal Engineer (review) 2.00 hour S 159.00 S 318.00 <br /> Project Engineer 14.00 h~151rs S 113.00 S 1,582.00 <br /> Drafting 4.00 hours S 83.00 S 332.00 <br /> Project Assistant 5.00 hours S 72.00 S 360.00 <br /> Support Staff 2.00 hours S 55.00 S 110.00 <br /> Subtotal S 10,504.00 S 22,930.00 <br /> <br /> ®~E$IGN~ Attachment Eugener7-01:051606 <br /> <br />