New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4384 GeoDesign Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4384 GeoDesign Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 9:58:27 PM
Creation date
6/16/2008 3:04:12 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004384
GL_Project_Number
965584
Identification_Number
2007100081
COE_Contract_Number
2007-00203
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> C~DESIGN? <br /> 2006 COE Contract 2007-00203 <br /> 1 $ Exhi bi t B - Scopeof Work <br /> May 16, 2006 <br /> City of Eugene, Public Works Engineering Division <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> Attention: Mr. Matt Rodrigues <br /> Proposal <br /> Pavement Engineering Services <br /> City of Eugene PPP 2008 <br /> Various Sites <br /> • Eugene, Oregon <br /> GeoDesign Project: Eugene-7-O1 <br /> INTRODUCTION <br /> GeoDesign, Inc. is pleased to submit this proposal for pavement engineering services for the <br /> City of Eugene, Oregon. This proposal is for pavement rehabilitation analysis consisting of falling <br /> weight deflectometer (FWD) testing, subsurface explorations, equivalent single-axle load (ESAL) <br /> calculations, and analysis on the following city streets: <br /> • 5"' Avenue from Washington to Blair, 2,067 feet <br /> • Bailey Hill Road from 18"' to Bertelsen, 6,007 feet <br /> • Barger from Highway 99 to Altamont, 2,381 feet <br /> • Centennial Boulevard from Lindley to Centennial Loop, 7,902 feet <br /> • Crescent from 50 feet East of Shadowview to Coburg, 2,123 feet <br /> • East Amazon Parkway from Hilyard to Dillard, 5,782„ <br /> • Hawkins Lane from West 18"' to 100 feet South of Videra, 6,241 feet <br /> • Jefferson from West 5~' Avenue to West 7"' Avenue, 761 feet <br /> • Norkenzie from Green Acres to Beltline Bridge, 1,293 feet <br /> BACKGROUND AND APPROACH <br /> Based on information provided by Mr. Matt Rodrigues, we understand that the Ciry is considering <br /> rehabilitation of the above-listed road sections. We have completed a preliminary evaluation of <br /> the existing pavements at the site. There is limited potential for overlay on these road sections <br /> due to curbs and existing grades. Distress is predominately limited to transverse cracking and <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.