Project` EUGENE-7-01 City of Eugene PPP 2008 Invoice 11808 <br /> Atterberg Limits 2.0 Tests ~ 105.00 210.00 <br /> Moisture Content 7.0 Tests cLD 12.00 84.00 <br /> PSA Sieve 3.0 Tests ~ 80.00 240.00 <br /> Total Units 2,254.60 2,254.60 <br /> Bllling Limits Current Prior To-Date <br /> Total Billings 7,518.24 390.15 7,908.39 <br /> Limit 11,309.33 <br /> Remaining 3,400.94 <br /> Total this Task 57,518.24 <br /> Teisk 03 Barger <br /> Professional Personnel <br /> Hours Rate Amount <br /> Project Manager I 3.00 113.00 339.00 <br /> EngineeringlGeological Staff III 10.80 103.00 1,112.40 <br /> Senior Technician .50 83.00 41.50 <br /> CAD 1.60 83.00 132.80 <br /> Project Assistant 1.95 72.00 140.40 <br /> Totals 17.85 1, 766.10 <br /> Total Labor 1,766.10 <br /> <br /> Mice 8 Equlpment Fee <br /> 3.00% of 1, 766.10 52.98 <br /> Total Fee ~ 52.98 52.98 <br /> Outside Services <br /> Dan J. Fischer Excavating, Inc. 1,130.00 <br /> D8~H Flagging Inc. 491.40 <br /> Total Outside Services 1.12 times 1,621.40 1,815.97 <br /> 1'ijaimbursiib{e Expenses <br /> Meais 33.87 <br /> Travel & Lodging 55.55 <br /> Mileage 17.40 <br /> Total Reimbursables 106.82 108.82 <br /> Ur,lt Billing <br /> FWD, data & analysis 0.4 Days @ 1,500.00 600.00 <br /> Geotech Field Equipment 1.0 Day ~ 10.00 10.00 <br /> Vehicle Mileage 76.0 Miles ~ 0.60 45.60 <br /> ' Vehicle Part Day Charge 1.0 Day @ 20.00 20.00 <br /> Vehicle Full Day Charge 1.0 Day @ 40.00 40.00 <br /> Atterberg Limits 1.0 Test ~ 105.00 105.00 <br /> Moisture Content 5.0 Tests ~ 12.00 60.00 <br /> PSA Sieve 2.0 Tests @ 80.00 160.00 <br /> Digital Camera 2.0 Days ~ 10.00 20.00 <br /> Remit To: GeoDeaign, Inc. -15575 SW Sequoia Parkway -Suite 100 -Portland, OR 97224 Page 3 <br /> <br />