<br /> Contract Preliminary Progress Payment
<br /> Paysant No ~ 003
<br /> Contractor: CPM DEVHLOPMENT Original Contract: $1,517,360.00
<br /> Job k: 93-004383 Current Amount: $1,517,360.00
<br /> Contract No: 200E-00006 Contract Award Date: 08/14/2007
<br /> PO k: 200E 100125 Completion Date: 09/30/2007
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals i Complete
<br /> Line Description Iaet CMg Ord Unit Price Uait Meaeuze Quantity Amount Quantity Amount antic Amount
<br /> LROACY NN INTRRCRDTOR 8. AYALON/TRRRY/RO09EVRLT
<br /> Oenaral
<br /> 0000 Liquidated Damages ($1,000.00) DAY 0.000 $0.00 2.000 ($2,000.00) 2.000 ($2,000.00) 0.00
<br /> 0010 MOBILIZATION $190,000.00 LUMPSUM 1.000 $190,000.00 0.200 $38,000.00 1.000 $190,000.00 M 100.00
<br /> 0020 CLEARING AND GRUBBING S3 000.00 LUMPSUM 1.000 $3,000.00 0.500 $1 500.00 1.000 $3,000 00 100.00
<br /> 0030 TEMP. WORK ZONE TRAFFIC CONTRO $3,000.00 LUMPSUM 1.000 $3,000.00 0.500 $1,900.00 1.000 $3,000.00 100.00
<br /> 0040 EROSION CONTROL $15,000.00 LUMPSUM 1.000 $15,000.00 0.200 $3,000.00 1.000 $15,000.00 100.00
<br /> 0050 CONSTRUCTION ENTRANCES $1,200.00 EACH 2.000 $2,900.00 0.000 $0.00 2.000 $2,400.00 100.00
<br /> 0060 21000 GAL FRAC TANK $300.00 DAY 30.000 $9,000.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0070 FRAC TANK MOB $1,200.00 EACH 1.000 $1,200.00 0.000 $0.00 0.000 $0.00 0.00
<br /> OOBO 4E INCH SANITARY SEWER PIPS 2 $330.00 POdf 3 009.000 $991 650 00 722.000 $230,260 00 2,760.000 $910,800 00 M 92 00
<br /> 0090 42 INCH SANITARY SEWER PIPE, 2 $350.00 FOOT 394.000 $137,900.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0100 CONCRETH SANITARY SEWER MANHOL - $10,000.00 EACH 8.000 $80,000.00 4.000 $40,000.00 8.000 $80,000.00 100.00
<br /> 0110 CONCRETE SANITARY MANHOLE, DRO $11,000.00 EACH 1.000 $11 000.00 0.000 $0.00 1.000 $11 000.00 100.00
<br /> 0120 WATERTIGHT CONCRETE CLOSURE CO $1,800.00 EACH 1.000 $1,800.00 0.000 $0.00 1.000 $1,800.00 100.00
<br /> 0130 BENTONITE GETBXTILE FABRIC $8.50 SQYD 3,600.000 $30,600.00 1,800.000 $15,300.00 3,600.000 $30,600.00 100.00
<br /> 0140 CONNECTION TO EXISTING STRUCTU $1,400.00 EACH 1.000 $1,400.00 0.000 $0.00 1.000 $1 400.00 100.00
<br /> 0150 CLSM CUTOPP WALLS $2,000.00 EACH 9.000 $8,000.00 1.000 $2,000.00 4.000 $8,000.00 100.00
<br /> 0160 REMOVE EXISTING WASTEWATER MAN $1,500.00 EACH 1.000 $1,500.00 0.000 $0.00 1.000 $1,500.00 100.00
<br /> 0170 LEVEL Z, 1/Z ]:NCB DBf7BE, NNAC $150.00 TON 24.000 $3,600.00 33.000 $4,950.00 33.000 $4,950.00 138.00
<br /> 0180 HYDROSHBDING $1,400.00 ACRE 6.000 $8,400.00 4.800 $6,720.00 4.800 $6,720.00 80.00
<br /> 0190 CONSTRUCTION ZONE PENCING $3.00 FOOT 5,970.000 $17,910.00 0.000 $0.00 5,200.000 $15,600.00 87.00
<br /> 81,517,360.00 $349,230.00 $1,283,770.00