<br /> Contract Preliminary Progreea Payment
<br /> Payawat No s 004
<br /> ~ Contractor: CPM DEVELOPMENT Original Contract: $1,517,360.00
<br /> Job 93-004383 Current Amount:
<br /> $1,517,360.00
<br /> Contract No: 2008-00006 Contract Award Date: 08/14/2007
<br /> PO 2008100125 Completion Date: 09/30/2007
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals i Complete
<br /> Line DeaCrlpClOn Last Ctulg Ord Unit Pr1Ce Unit Measure Qadntlty Amount dntlt Amount antic Amount
<br /> LH(311CY W41 INTBRCBPTOR 3. AVALON/THRRY/ROOSBVHLT
<br /> Oenaral
<br /> 0000 Liquidated Damages ($1,000.00) DAY 0.000
<br /> $0.00 0.000 $0.00 2.000 ($2,000.00) 0.00
<br /> 0010 MOBILIZATION $190,000.00 LUMPSUM 1.000 $190,000.00 0.000 $0.00 1.000 $190,000.00 M 100.00
<br /> 0020 CLEARING AND GRUBBING $3,000.00 LUMPSUM 1.000 $3,000.00 0.000 $0.00 1.000 $3,000.00 100.00
<br /> 0030 TEMP. WORK ZONE TRAFFIC CONTRO $3,000.00 LUMPSUM 1.000 $3,000.00 0.000 $0.00 1.000 $3,000.00 100.00
<br /> 0040 EROSION CONTROL $15,000.00 LUMPSUM 1.000 $15,000.00 0.000 $0.00 1.000 $15,000.00 100.00
<br /> 0050 CONSTRUCTION ENTRANCES $1,200.00 EACH 2.000 $2,400.00 0.000 $0.00 2.000 $2,400.00 100.00
<br /> 0060 21000 GAL FRAC TANK $300.00 DAY 30.000 $9,000.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0070 FRAC TANK MOB $1,200.00 EACH 1.000 $1,200.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0080 48 INCH SANITARY SEWER PIPE, 2 $330.00 POOT 3,005.000 $991,650.00 245.000 $80,850.00 3,005.000 $991,650.00 M 100.00
<br /> 0090 42 INCH SANITARY SEWER PIPE, 2 $350.00 FOOT 394.000 $137,900.00 232.000 $81,200.00 232.000 $81,200.00 59.00
<br /> 0100 CONCRETE SANITARY SEWER MANHOL $10,000.00 EACH 8.000 $80,000.00 0.000 $0.00 8.000 $80,000.00 100.00
<br /> 0110 CONCRETE SANITARY MANHOLE, DRO $11,000.00 EACH 1.000 $11,000.00 0.000 $0.00 1.000 $11,000.00 100.00
<br /> 0120 WATERTIGHT CONCRETE CLOSURE CO $1,800.00 EACH 1.000 $1,800.00 0.000 $0.00 1.000 $1,800.00 100.00
<br /> 0130 BENTONZTE GETEXTILE FABRIC $8.50 SQYD 3,600.000 $30,600.00 0.000
<br /> $0.00 3,600.000 30 600.00
<br /> S 100.00
<br /> 0140 CONNECTION TO EXISTING STRUCTU $1,400.00 EACH 1.000 $1,400.00 0.000 $0.00 1.000 $1,400.00 100.00
<br /> 0150 CLSM CUTOFF WALLS $2,000.00 EACH 4.000 $8,000.00 0.000 $0.00 4.000 $8,000.00 100.00
<br /> 0160 REMOVE EXISTING WASTEWATER MAN $1,500.00 EACH 1.000 $1,500.00 0.000 $0.00 1.000 $1,500.00 100.00
<br />
<br /> 0170 L8V8L 1, 1/1 INCH DSN38, ANAC $150.00 TON 14.000 $3,600.00 0.000 $0.00 33.000 $4,950.00 138.00
<br />
<br /> 0180 HYDROSEEDING $1,400.00 ACRE 6.000 $8,400.00 0.000 $0.00 4.800 $6,720.00 80.00
<br />
<br /> 0190 CONSTRUCTION ZONfi FENCING $3.00 POOT 5,970.000 $17,910.00 0.000 $0.00 5,200.000 $15,600.00 87.00
<br /> $1,517,360.00 $162,050.00 $1,445,820.00