x l <br /> Run Date: 08/08 Run Date: 08/08/2006 16:61:22 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: 1 Contractor: EUGENE SAND <br /> Job Job 93-004382 Original Contract: $256,546.00 <br /> Contract No: Contract No: 2006-00026 Current Amount: $256,546.00 <br /> PO PO 2996199454 Contract Award Date: 06/09/2006 <br /> Assessable: i Assessable: No Completion Date: 08/09/2006 <br /> Line Descr: Line Description Las~Ord Current Contract Estimated Payment Cumulative Totals <br /> Unit Price ~ Unit Measure Quantity Amount Quantity Amount <br /> Quantity Amount <br /> 0380 CONSTI 0180 CONNECTION TO EXISTING STRUCTU <br /> $400.00 0.000 <br /> 0390 CONCRI POTHOLfi $400.00 EACH 1.000 $0.00 0.000 $0.00 <br /> 0190 $400.00 EACH <br /> 7.000 $2,800.00 1.000 $400.00 1.000 <br /> 0400 TEMPOi 0200 $400.00 <br /> ABANDON SEVER LING fi CONNECTIO $400.00 EACH 4.000 <br /> $1,600.00 0.000 $o.oo o.ooo $o.oo <br /> 0410 CONCRI 0210 TEMPORARY COLD MIX <br /> $1.60 S FT $3,097.50 209.600 <br /> Q 2,065.000 $306.76 204.500 <br /> 0420 CONCRI 0220 CONCRETg CURB AND GUTTER $306.75 <br /> $43.00 FOOT 130.000 $6,590.00 8.400 $361.20 8.400 <br /> 0430 7" COi 0230 CONCRETE DRIVEWAYS $361.20 <br /> $12.00 SQFT 100.000 $1,200.00 0.000 <br /> 044o ABAND( $o.oo o.ooo $o.oo <br /> 0240 CONCRETE WALKS 9" $6.50 SQFT 700.000 <br /> $4,550.00 46.980 $302.12 46.480 $302.12 <br /> 0450 PLUG I 0250 7" CONCRETE SURFACING <br /> $10.00 S FT $12,700.00 875.350 <br /> <br /> 0460 ABAND( 0260 LANDSCAPING Q 1,270.000 $8,763.60 675.360 $8,753.50 <br /> $2,600.00 LUMPSUM 1.000 $2,600.00 O.s00 $1,300.00 O.s00 <br /> 0270 AC PATCH, ALL DEPTHS $1,300.00 <br /> $135.00 TON 40.000 $5,900.00 0.000 $0.00 0.000 <br /> 0280 PLUG END OF PIPE AND MARK $0.00 <br /> $60.00 EACH 8.000 $400.00 7.000 $360.00 7.000 <br /> 0290 RESIZE MANHOLE CHANNEL FROM 6" $360.00 <br /> $650.00 HACH 1.000 $650.00 0.000 $0.00 0.000 <br /> 0300 6" WASTHWATER MAIN TAP $0.00 <br /> $300.00 EACH 1.000 $300.00 0.000 <br /> Alternate 1 So.oo o.ooo $o.oo <br /> 0320 TREE PROTECTION FHNCING $2.50 FOOT <br /> 300.000 $750.00 0.000 <br /> 0330 FLAGGERS $0.00 0.000 $0.00 <br /> $40.00 HOUR 24.000 $960.00 0.000 $0.00 0.000 <br /> 0340 REMOVAL OP MANHOLES $0.00 <br /> Ssso.oo EACH l.ooo $sso.oo o.ooo $o.oo o.ooo <br /> 0350 6 INCH PVC SEWER PIPE i $0.00 <br /> $53.00 LINFT 44.000 $2,332.00 0.000 $0.00 0.000 <br /> 0360 8 INCH PVC SEWBR PIPE $0.00 <br /> $59.00 LINFT 130.000 $7,670.00 0.000 $0.00 0.000 <br /> 0370 6 INCH HIGH PRESSURH SEWER PIP $0.00 <br /> $55.00 LZNFT 44.000 $2,420.00 0.000 $0.00 0.000 <br /> $0.00 <br /> <br />