Billable Project Cost <br /> 1 1/09/2006 2:51'52 PM s As Of 09/3 0/2 006 <br /> Project Billed Acti- <br /> Billed ~ vi Try Try Resource Em loved <br /> Page 2 of 90 <br /> 0416 Franklin Pavement Preservation (4390) uanti $A- Total Amount Billed <br /> Ope, <br /> rOvhd Ad- <br /> mOvhd Transaction Remark <br /> 3636213 Materials Testin $761.02 $714.86 <br /> $1,475.88 <br /> 186C ,gsnhaltic concrete quality control (CE) $761.02 $714.86 <br /> j `~0-9/18/2006 n1356032 $1,471.88 <br /> / 09/18/2006 Engineering Technician 2 $767.01 $7]4.86 <br /> ~~llll n1356032 PASSENGER VANS 6'S L-H $],475.$8 <br /> 09/18/2006 n1374072 $225.42 $252.47 <br /> Engineering Associate 6.5 H $39.00 AC DF' S <br /> 09/18/2006 n1374072 CARGO VANS <br /> 1.5 L-H $40.22 ACDF'S <br /> v~NQ12006 n1374075 En neerin 1.5 $45.04 <br /> 09/212006 n1374075 ~ g Associate H $8.25 AC TESTING <br /> CARGO VgNS 2 L-H $53.62 AC TESTING <br /> 09222006 n1356056 2 H $60.05 AC TESTING <br /> -~2 006 Engneering Technician 2 $I 1 Op <br /> J ly n1356056 PASSENGER VANS 8 L-H AC TESTING <br /> 23/2006 01374017 Engineenn g H $184 96 $207.16 AC DF'S <br /> 09232006 oI374017 gAssociate $48.00 <br /> CARGO VANS 5 L-H $134.05 AC DF'S <br /> 3 H $ 150,14 <br /> $16.50 AC TESTING <br /> AC TESTING <br /> ,,,tr. <br /> - <br /> <br /> s , u <br /> <br />