Sand Tra Lane Storm Extension GJN 4389 <br /> Projected Estimate <br /> Install two inlets and one manhole at end of street and connect to existing storm on Meadow View with <br /> 10" PVC pipe. <br /> Construction Costs Quantit Units Unit Price Extended Total <br /> Mobilization 1 LS $2,000.00 $2,000.00 <br /> Erosion Control 1 LS $500.00 $500.00 <br /> Temporary Traffic Control, Complete 1 LS $2,000.00 $1,000.00 <br /> Connect to Existing Manhole 1 EA $600.00 $600.00 <br /> 10" PVC Pipe 160 LF $40.00 $6,400.00 <br /> TV Inspection 160 LF $1.50 $240.00 <br /> Curb Inlet Type 4A 2 EA $1,500.00 $3,000.00 <br /> Concrete Storm Manhole (42") 1 EA $2,000.00 $2,000.00 <br /> <br /> Trench Resurfacing 83.5 SY $30.00 $2,505.00 <br /> Construction Sub-Total $18,245.00 <br /> Other Costs <br /> Contingency 10% $1,824.50 <br /> Testing $400.00 <br /> Design Engineering $11,000.00 <br /> Total Other Costs $13,224.50 <br /> <br /> TOTAL $31,469.50 <br /> <br />