C ' fr~- <br /> Page 1 <br /> Run Date: 4/6/2006 <br /> City of Eugene ' <br /> Bid Tabulation <br /> Quote 2006-000007 <br /> <br /> Job No. 93-004389 <br /> Sand Trap Lane Reconstruction West of Meadow View Drive <br /> Engineer's Estimate 2G Construction Eugene Sand & Gravel Wildish Construction Case~Jones <br /> Line <br /> No. Description uantit Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount <br /> General <br /> 10 MOBILIZATION 1 LUMPSUM $2,000.00 $2,000.00 $2,041.22 $2,041.22 $3,500.00 $3,500.00 $5,000.00 $5,000.00 $8,000.00 $8,000.00 <br /> 20 TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1 LUMPSUM $1,000.00 $1,000.00 $736.00 $736.00 $1,000.00 $1,000.00 $400.00 $400.00 $4,000.00 <br /> $4,000.00 <br /> 30 EROSION CONTROL 1 LUMPSUM $500.00 $500.00 $681.00 $681.00 $1,000.00 $1,000.00 $150.00 $150.00 $2,200.00 $2,200.00 <br /> 40 INLET PROTECTION 2 EACH $90.00 $180.00 $74.00 $148.00 $75.00 $150.00 $50.00 $100.00 $300.00 $600.00 <br /> 50 REMOVAL OF CURBS 196.9 FOOT $8.00 $1,575.20 $2.29 $450.90 $3.00 $590.70 $4.00 $787.60 $10.00 $1,969.00 <br /> 60 REMOVAL OF SURFACINGS 192.5 SQYD $5.00 $962.50 $5.45 $1,049.13 $8.00 $1,540.00 $12.00 $2,310.00 $20.00 $3,850.00 <br /> 70 REMOVAL OF WALKS AND DRIVEWAYS 21 SQYD $10.00 $210.00 $17.15 $360.15 $8.00 $168.00 $19.00 $399.00 $2D.00 $420.00 <br /> 80 ASPHALT PAVEMENT CUTTING 21 FOOT $17.00 $357.00 $5.49 $115.29 $1.00 $21.00 $3.00 $63.00 $15.00 $315.00 <br /> 90 CONCRETE SAWING 33 FOOT $17.00 $561.00 $4.69 $154.77 $4.00 $132.00 $3.00 $99.00 $25.00 $825.00 <br /> 100 TOE TRENCH EXCAVATION 3.9 CUYD $25.00 $85.00 $24.00 $81.60 $50.00 $170.00 $90.00 $306.00 $205.00 $697.00 <br /> 110 DRAINAGE GEOTEXTILE 144 SQFT $1.50 $216.00 $1.69 $243.36 $1.00 $144.00 $1.00 $144.00 $10.00 $1,440.00 <br /> 120 AGGREGATE BASE 27.8 CUYD $60.00 $1,668.00 $27.90 $775.62 $35.00 $973.00 $125.00 $3,475.00 $28.78 $800.08 <br /> 130 LEVEL 2, 1/2", DENSE GRADED, HMAC 41.7 TON $150.00 $6,255.00 $139.59 $5,820.90 $98.00 $4,086.60 $100.00 $4,170.00 $100.00 $4,170.00 <br /> 140 STANDARD CONCRETE CURBS 23 FOOT $15.00 $345.00 $15.87 $365.01 $35.00 $BOS.OD $20.00 $460.00 $35.00 $805.00 <br /> 150 CONCRETE CURB AND GUTTER 190.7 FOOT $10.00 $1,907.00 $26.77 $5,105.04 $23.00 $4,386.10 $18.00 $3,432.6D $40.00 $7,628.00 <br /> 160 CONCRETE DRIVEWAYS 188.3 SQFT $3.00 $564.90 $5.77 $1,086.49 $9.00 $1,694.70 $12.00 $2,259.60 $9.00 $1,694.70 <br /> 170 LANDSCAPE, IRRIGATION, GRADING MODIFICATIONS 1 LUMPSUM $1,D00.00 $1,000.00 $1,065.00 $1,065.00 $2,80D.00 $2,800.00 $2,500.00 $2,500.00 <br /> $7,500.00 $7,500.00 <br /> 180 1-1/2" - 3/4" GRANULAR DRAIN MATERIAL 3.4 CUYD $50.00 $170.00 $43.00 $146.20 $40.00 $136.00 $70.00 $238.00 $300.00 $1,020.00 <br /> TOTAL: $19,556.60 $20,425.68 $23,297.10 $26,293.80 $47,933.78 <br /> <br />