<br /> _ <br /> ~e-9~e~ <br /> e~at~g-fac~k~es- <br /> > > <br /> _ <br /> §`d~ The Owner shall`provide full information in a timely manner regarding requirements for and limitations on the <br /> Project, including a written program which shall set forth the Owner's objectives, schedule, constraints and criteria, <br /> including spacerequirements and relationships, flexibility, expandability, special equipment, systems and site <br /> requirements. The Owner shall furnish to the Architect, within ~3-fifteen (15) business days after receipt of a written <br /> . request, information <br /> 1~g6reasonably required by the Architect. <br /> § 4.2 The Owner shall establish and periodically update an overall budget for the Project, including the Construction <br /> Cost, the Owner's other costs and reasonable contingencies related to all of these costs. <br /> AIA Document B151TM -1997. Copyrlght ®1974,1978,1987 and 1997 by The American Institute of Arohitects. All rights rossrved. WARNING: This AIA' <br /> Document is protected by U.S. Copyright Law and International Trestles. Unauthorized reproduction or distribution of this AfA® Document, ar any 7 <br /> portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document <br /> was produced by AIA software at 08:16:55 on 04/11/2007 under Order No.1000258284_t which expires on 10/4/2007, and is not for resale. <br /> User Notes: (1309649642) <br /> <br />