Run Date: 7/18/2006 ~ Page 1 <br /> City of 8ugene <br /> Bid Tabulation <br /> 2006-000023 <br /> Job N0. 93-004398 <br /> Eugene Airport Administration Parking Lot Rehab at 28855 Lockheed Drive <br /> Engineer's Estimate Morse Bros. Eugene Sand & Gravel Wildish Construction Co <br /> Line <br /> 10. Description uantit Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount <br /> GBNBRAL <br /> 10 MOBILIZATION 1 LUMPSUM $10,106.00 $10,106.00 $7,400.00 $7,400.00 $5,900.00 $5,900.00 $16,000.00 $16,000.00 <br /> 20 EROSION CONTROL 1 LUMPSUM $1,000.00 $1,000.00 $500.00 $500.00 $650.00 $650.00 $500.00 $500.00 <br /> 30 TEMP PROTECTN/DIRECTN 1 LUMPSUM $1,000.00 $1,000.00 $900.00 $900.00 $1,200.00 $1,200.00 $1,500.00 $1,500.00 <br /> 40 MH ADJUST - SAN 1 EACH $1,200.00 $1,200.00 $550.00 $550.00 $250.00 $250.00 $950.00 $950.00 <br /> 50 CLEANOUT ADJUSTMENT - SAN 1 EACH $1,200.00 $1,200.00 $200.00 $200.00 $225.00 $225.00 $500.00 $500.00 <br /> 60 JB ADJUSTMENT - ELEC 2 EACH $1,200.00 $2,400.00 $1,100.00 $2,200.00 $820.00 $1,640.00 $1,000.00 $2,000.00 <br /> 70 COLD PLANE PVMT REMOVAL, VARIOUS DEPTH 19875 SQFT $0.60 $11,925.00 $0.68 $13,515.00 $0.70 $13,912.50 $0.65 $12,918.75 <br /> 80 LEVEL II, 1/2 Inch Dense HMAC 680 TON $60.00 $40,800.00 $57.00 $36,760.00 $67.00 $45,560.00 $60.00 $40,800.00 <br /> 90 PAINTED PERMANENT PVMT STRIPING, COMPLETE 1 LUMPSUM $3,000.00 $3,000.00 $1,650.00 $1,650.00 $1,400.00 $1,400.00 $2,600.00 $2,600.00 <br /> 100 HMAC Leveling Course 55 TON $100.00 $5,500.00 $67.00 $4,785.00 $76.00 $4,180.00 $100.00 $5,500.00 <br /> 110 DISABLED PERSON PARKING SYMBOL 7 EACH $50.00 $350.00 <br /> $55.00 $385.00 $50.00 $350.00 $105.00 $735.00 <br /> 120 8" PAINTED LETTERING 1 LUMPSUM $1,000.00 $1,000.00 $400.00 $400.00 $350.00 $350.00 $300.00 $300.00 <br /> 130 SURFACING STABILIZATION 10 SQYD $300.00 $3,000.00 $92.00 $920.00 $250.00 $2,500.00 $220.00 $2,200.00 <br /> Total: General $82,461.00 $72,165.00 <br /> $78,117.50 $86,503.75 <br /> <br /> ALTERNATB #1 <br /> 140 ADDITIVE ALTERNATE SCHEDULE 1 LUMPSUM $5,000.00 $5,000.00 $3,668.00 $18,000.00 $14,300.00 <br /> Totals Alternate #1 $5,000.00 $3,668.00 $18,000.00 $14,300.00 <br /> GRAND TOTAL: $87,481.00 $75,833.00 <br /> $96,117.50 $100,603.75 <br /> <br />