CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Jobs a396 <br /> contrail tt 2008.03 <br /> CONTRACTOR: 2G Inc. dba 2G Construe8on Change Order i 2 <br /> (ADDRESS) 1719 Irving Road Dab: 0123107 <br /> Eugene, OR 97440 CAMS Dab: <br /> Reviewed by: Dab: <br /> PROJECT: W ipakenzie Park knprovemenb at 1735 Best Lane Inspector: A. Steffen <br /> Prof. Mar. S. Mllovich <br /> Prindpal Eng. M. Cahill <br /> <br /> You are directed to make the following changes in this contract <br /> <br /> Contract <br /> Item <br /> No. <br /> 610 Provkle mulch over seedi on mound <br /> 620 Construct and cable fence on south border of new rk Bevel eM <br /> 830 Instill rk rules si n as directed <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Time Quantity UMt Amended Net <br /> No. Item Chan a Units Cost Amount +1- Chan a Chan e <br /> 610 Provide mulch over seeding on mound Orl anal 0.00 .00 .00 j6.00 <br /> Revised 0.00 .00 .00 <br /> Amended 1.00 LS 598.79 598.79 598.79 <br /> 620 Construct post and cable fence ON Inal 0.00 .00 0.00 j0.00 <br /> Revised 0.00 .00 0.00 <br /> Amended 1.00 LS 7500.79 7500.79 7500.79 <br /> 630 InsbA park rules sign Ori final 0.00 .00 .00 j0.00 <br /> Revsed 0.00 .00 .00 <br /> Amended 1.00 LS 589.74 89.74 589.74 <br /> O foal 0.00 .00 .00 j0.00 <br /> Revised 0.00 .00 .00 <br /> Amended 0.00 .00 .00 0.00 <br /> 0 Inal 0.00 .OD .00 j0.00 <br /> Revised 0.00 .00 .00 <br /> Amended 0.00 .00 .00 .00 <br /> Orl anal 0.00 .00 .00 ;0.00 <br /> Revised 0.00 .00 .00 <br /> Amended 0.00 .00 0.00 .00 <br /> The original contract work days are o.o da <br /> The contrect time change this C.O 0.o de <br /> The contract time change by previous C.O.'s o.D da <br /> The new contract work da are o.o da <br /> The original contract sum was 5425,786.73 <br /> Net change by previous change order =0•~ <br /> Net change due to amendment by previous change order i1a,575.s5 <br /> The contract sum prior to this change order was 3440,3s2.5a <br /> This change order will change contract sum by this amount sa,ssa.3z <br /> The new contract net change sum SO.DO <br /> The new contract amendment sum j23,265.t 7 <br /> The new contract sum including this change order will be E44s,o51.90 <br /> Percents a of on final contract 5.4s% <br /> NET CHANGE DUE TO AMENDMENTS <br /> 5.46% <br /> Approval by: <br /> City Engineer Prime Contractor Third Party <br /> / <br /> Date Date Date <br /> CONTRACTOR D OFFICE FILE ~ PURCHASINGICRO <br /> O~FORMStPROJECIICONSTIREVISED CHANGE ORDER.XLS <br /> <br />