Rus+ Date: 09/11/2007 16:20:38 <br /> ~ City of Eugene Page 3 <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractor: WILDISH CONST. <br /> Job 93-004426 Original Contract: $553,094.76 <br /> Contract No: 2007-00021 Current Amount: $s56,159.10 <br /> PO p: 2007100400 Contract Award Date: 06/13/2007 <br /> Assessable: No Completion Date: <br /> Current Contract Estimated Payment Cumulative Totals ~ Complete <br /> Line Description Last Chng Ord Uni[ Price Unit Measure _ Quantity Amount Quantity Amount <br /> Quantity Amount <br /> 0220 THERMOPLASTIC, NON-PROFILE, 90 $7,000.00 LUMPSUM 1.000 $7,000.00 0.000 $0.00 1.000 <br /> Z~ $7,000.00 100.00 <br /> PPP NORKHNZIS FROM GRHHN ACRHS TO BHLTLINH $109,811.64 ~ ~ $1,400.00 $111,400.65 <br /> General <br /> 0000 LIQUIDATED DAMAGES-NORKENZIE DAY 0.000 <br /> 0.000 0.00 <br /> 0010 MOBILIZATION $5,000.00 LUMPSUM 1.000 $s,000.00 0.000 $0.00 1.000 <br /> $5,000.00 100.00 <br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO $5,000.00 LUMPSUM 1.000 $5,000.00 0.000 $0.00 1.000 <br /> $5,000.00 100.00 <br /> 0030 TEMPORARY STRIPING $2,s00.00 LUMPSUM 1.000 $2,500.00 0.000 $D.00 1.000 <br /> $z,soo.oo loo.oo <br /> 0040 FLAGGERS $40.00 HOUR 300.000 $12,000.00 0.000 $0.00 168.500 <br /> $6,740.00 56.00 <br /> 0050 EROSION CONTROL $600.00 LUMPSUM 1.000 $600.00 0.000 $0.00 1.000 <br /> $600.00 100.00 <br /> 0060 CITY PROVIDED SPEC INFO SIGNS $250.00 EACH 4.000 $1,000.00 0.000 $0.00 4.000 <br /> $1,000.00 100.00 <br /> 0070 SURFACING STABILIZATION $130.00 CUYD 8.000 $1,040.00 0.200 $26.00 6.700 <br /> $871.00 84.00 <br /> 0080 ADJU3TING BOZHS $200.00 EACH 3.000 S600.00 2.000 S400.00 1.000 <br /> S800.00 133.00 <br /> 0090 MINOR ADJUSTMENT OF MANHOLES $1,100.00 EACH 3.000 $3,300.00 0.000 $0.00 3.000 <br /> $3,300.00 100.00 <br /> 0100 REM/REPL 12" SD WITH 12° CLASS $150.00 FOOT 10.000 $1,500.00 0.000 $0,00 8.000 <br /> $1,200.00 80.00 <br /> 0110 MH REM/REPL FRAME/COVER-WW $250.00 EACH 1.000 $250.00 0.000 $0.00 1.000 <br /> $250.00 100.00 <br /> 0120 MH REM/REPL FRAME/COVER-ST $250.00 EACH 2.000 $500.00 0.000 $0.00 2.000 <br /> $500.00 100.00 <br /> 0130 COLD PLANE PVMT REMOVAL, 2" D $0.22 SQFT 33,316.000 $7,329.52 0.000 $0.00 33,529.800 <br /> $7,376.56 101.00 <br /> 0140 PAVEMENT REMOVAL $0.70 SQFT 7,644.000 $5,3s0.80 0.000 $0.00 7,276.500 <br /> $5,093.55 96.00 <br /> 0150 LEVEL 2, 1/2" DENSE, HMAC $50.00 TON s20.000 $26,000.00 0.000 $0.00 542.500 <br /> $27,125.00 104.00 <br /> 0160 LEVEL 2, 3/4" DENSE, HMAC $50.00 TON 290.000 $14,600.00 0.000 $0.00 287.470 <br /> $14,373.50 99.00 <br /> 0170 PVMT LEGEND, TYPE A2 or H: ARR $165.00 EACH 2.000 $330.00 0.000 $0.00 2.000 <br /> $330.00 100.00 <br /> <br /> 0180 PVMT LEGEND, TYPE A2 or B: BIC $175.00 EACH 4.000 $700.00 0.000 $0.00 4.000 <br /> $700.00 100.00 <br /> <br /> 0190 PVMT LEGEND, TYPE A2 or B: STO $205.00 EACH 1.000 $205.00 0.000 <br /> $0.00 1.000 $205.00 100.00 <br /> <br />